EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 20, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a civil project in Concord, New Hampshire. Completed plans call for site work for a road / highway; water / sewer project; and for paving for a road / highway.

This Project includes, but is not limited to, the following items of work: traffic control, erosion control, pulverizing & stockpiling existing pavement, sanitary sewer, watermain, sewer & water services, excavation, grading, placement of recycled asphalt base, aggregate base, hot mix asphalt, aggregate shouldering, and turf restoration. This project includes an 8" watermain loop connecting the existing 10" watermain on Bush Brothers Drive and the existing 6" watermain at Sandy Hill Drive. The existing sanitary sewer main along Sandy Hill Drive within 500' of City Well #9 is to be replaced with watermain grade PVC pipe. The existing sanitary sewer main will be extended west as shown on the plan to eliminate existing long lateral services. 750 lin.ft. 8" PVC Sewer 825 in.ft. 8" PVC Watermain 3,160 sq.yds. Pulverize Pavement 1,470 tons Agg Base 670 tons HMA

Award

Roads / Highways

$218,945.00

Public - City

Paving, Site Work

12

16

3

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Closeout Submittals, Bonds
Division 08 - Openings

Division 08 - Openings

Glazing, Mirrors
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Backfill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
97
Bidding Soon
2,168
All Active Projects
859
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

May 18, 2023

img_map_placeholder

Multiple Locations, Concord, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.