EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 16, 2024 at 8:00 PM

Updated October 1, 2024

Site work and new construction of an educational facility in Haverhill, Massachusetts. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

Northern Essex Community College (NECC) Haverhill Campus Health & Wellness Facilities The Commonwealth of Massachusetts, acting by and through its Division of Capital Asset Management and Maintenance (DCAMM), in collaboration with Northern Essex Community College (NECC). Redevelopment of the Health & Wellness Facilities on the NECC Haverhill Campus with an address of 100 Elliott Street, Haverhill, Massachusetts. The project contemplates leasing approximately 16 acres of land, including the Sports and Fitness Center and surrounding athletic fields, in a long-term ground lease of up to 99 years. DCAMM is commencing the RFP process for the subject proper- ty to improve the Sports and Fitness Center and the surrounding athletic fields for shared use with NECC. DCAMM and NECC envision that this redevelopment will revitalize the Health and Wellness Facilities, address deferred maintenance, con- tribute to campus decarbonization, foster neighbourhood relationships, boost recruitment and retention, and enhance connections with the sur- rounding community. DCAMM is holding a site tour on June 26, 2024 and a bidders' conference on July 10, 2024. To register for the site tour or bidders' conference interested parties must email necchwf. dcamm@mass.gov.

Post-Bid

Educational

$9,000,000.00

Public - County

New Construction, Site Work

6

15

4

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Warranties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Membrane Roofing
Division 10 - Specialties

Division 10 - Specialties

Fireplaces and Stoves, Storage Specialties, Lockers
Division 11 - Equipment

Division 11 - Equipment

Foodservice Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Lighting, Exterior Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Erosion and Sedimentation Controls, Shoring and Underpinning
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Feeders, Feeders
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
304
Active Projects
173
Bidding Soon
2,342
All Active Projects
1,071
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 30, 2024

October 29, 2024

img_map_placeholder

100 Elliott St, Haverhill, MA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Northern Essex Community College (NECC) Haverhill Campus Health and Wellness Facilities

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.