BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Garland, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of June 22, 2023, the project has not been awarded as bids remain unopened. A timeline for award has not been confirmed. All work not specifically identified as a pay item in the Bid Forms shall be considered incidental to the related pay items and the construction of the project. The following lists items that are considered incidental and included in the unit and lump sum bid prices. Refer to the Special Conditions and Scope of Work and Additional Related Information for more detailed explanation on incidental items. The City of Garland (City) will provide rights-of-way for the purpose of construction without cost to the Contractor by securing permits in areas of public dedication or by obtaining easements or Rights-of-Way across privately owned property. Bid Bond in the amount not less than five percent (5%) Performance Bond. Payment and Performance bonding will be for 100% Maintenance Bonding will be for 10% of the total awarded contract. Question Deadline :03/30/2023 at 5:00 PM CT Any questions pertaining to this request must be submitted through https://garlandtx.ionw WORKING DAYS: 260 WORKING DAYS Scope- Removing asphalt detour pavement - Repairing asphalt detour pavement - Cutting and plugging existing utility lines to be abandoned - Removal of existing lines in any location or in proposed trench lines - Adjusting water valve stacks, meters, wastewater cleanouts to finished grades - Maintaining positive drainage during all construction phases - Removing valves and fittings - Coordinating with the City of Dallas on work adjacent to the lake. - Substituting 5" of non-reinforced concrete for the asphalt detours. - Concrete curb is incidental to concrete pavement. - Providing a broom finish to the sidewalks and trails - Field adjusting locations of taps, connections, manholes, junction boxes, driveways, ramps, sidewalks, signs, and other miscellaneous appurtenances due to site changes occurring after bidding of plans. - Painting of steel railings - All fees, unless stated otherwise is this contract - Repairs to driveways, fences, walls, landscaping, irrigation and other private property that is avoidable, caused by the Contractor and not approved in writing by the City. - Field Office - Removing erosion control devices - Final cleanup

Bid Results

Roads / Highways

$3,039,915.00

Public - City

Paving, Site Work

101

18

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
80
Bidding Soon
3,597
All Active Projects
1,313
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.