Site work and paving for an educational facility in San Francisco, California. Completed plans call for site work for a educational facility; and for paving for a educational facility.

Phillip and Sala Burton High School Play Yard Site Improvements SFUSD Project. General Engineering Contractor with Asbestos and Lead Certification or Sub-Contractor with Asbestos and Lead Certification performing the work, or Class B, General Building Contractor with Asbestos and Lead Certification or Sub-Contractor with Asbestos and Lead Certification performing the work. Any Bidder not so duly and properly licensed shall be subject to all penalties imposed by law. Bid Security. Each Bid Proposal shall be accompanied by Bid Security in an amount not less than ten percent (10%) the DVBE Program which establishes a three percent (3%) Participation Goal for DVBEs. Description of Work: The Project is generally described as, but not limited to: repairing of existing play yard pavement, replacing existing play yard equipment with new sports equipment for basketball, volleyball, pickleball and tennis courts, providing new painted gamelines, site benches, vehicular chain link gates, repairs to existing chain link fences, and abating hazardous materials in the play yard. New sports equipment shall be furnished by the SFUSD PE Department and shall be installed by the Contractor. The Contractor is expected to work after school hours and weekends to complete the project on time as scheduled without additional cost to the Owner. Description of General Phasing Requirements: A. These descriptions of the phases are general in nature and in no way offer the complete and concise description of all the work required by the Contract Documents. B. The start dates represented in the milestone schedule are preliminary and the District reserves the right to modify these dates based on when the Notice to Proceed is issued. The Contractor is responsible for providing the manpower and scheduling the shifts necessary to complete the work in accordance with the Contract Time and Milestone Schedule. D. The School will remain open during the academic year. The Work of this project must take into account that the site will be occupied by students and staff and will be phased as generally described above and in other contract documents. E. Non-School hours are defined as hours before 7:00 a.m., and after 3:30 p.m. on days when school is in session. F. Hazmat work prohibited between 7:00 a.m. and 6:00 p.m. Haz-Mat Abatement cannot be performed while students or school staff is on site. G. Follow City of San Francisco Noise Ordinance. H. Work that is hazardous, noisy, or that causes vibration may not be performed in the buildings or on the site during school hours, without written approval from the District Representative. This includes but is not limited to the following work activities: 1. Haz-Mat Abatement 2. Concrete bushing, chipping, grinding, jack hammering. 3. The use of Powder-Actuated (PAT's) 4. Floor grinding to remove adhesive. 5. Chemicals used in quantities that cause excessive odor and can not be effectively ventilated. As determined by the Owners Representative. 6. Wall tile removal. Hand scraping or chipping may be acceptable as approved by the Owners Representative. 7. Electric Tile Cutter, may be used if isolated in a temporary sound deadening room constructed by the Contractor as approved by the Owners Representative. 8. Large impact drills for use in concrete. 9. Smaller Bulldog type impact drills for 1/4 " holes or less. 10. Operation of cranes in occupied areas, including drilling rigs, and concrete pump trucks unless the occupants can be sufficiently isolated from the swing zone. 11. Chop Saws for metal studs or other metal cutting. These may be used if isolated in a temporary sound deadening room constructed by the Contractor as approved by the Owner's representative. 12. The use of abrasive or "hot" saws to cut steel decking. 13. Earthwork compaction, including the operation of vibratory compaction equipment

Award

Educational

$865,300.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

19

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
159
Active Projects
86
Bidding Soon
1,803
All Active Projects
663
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2023

May 15, 2023

img_map_placeholder

400 Mansell St, San Francisco, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.