BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of a mixed-use development in Grand Terrace, California. Completed plans call for the renovation of a 54,808-square-foot educational facility; and fire / police facility.

The contract time is 50 calendar days. Interpretation of Plans and Documents/Pre-Bid Clarification. If any prospective bidder is in doubt as to the true meaning of any part of the Contract Documents, or finds discrepancies in, or omissions, a written request for an interpretation or correction thereof may be submitted to the Owner. The bidder submitting the request shall be responsible for its prompt delivery. Any interpretation or correction of the Contract Documents will only be made by Addendum duly issued, and a copy of such Addendum will be made available for each contractor receiving a set of the Contract Documents. No person is authorized to make any oral interpretation of any provision in the Contract Documents, nor shall any oral interpretation be binding on the Owner. If discrepancies on drawings, specifications or elsewhere in the Contract Documents are not covered by addenda, bidder shall include in their bid methods of construction and materials for the higher quality and complete assembly. Each request for clarification shall be submitted in writing, via email, to only the following persons: TO: Marco Eacrett SGH meacrett@sgharch.com CC: Kenny Porter, Facilities Project Manager Kenneth_porter@cjusd.net Each transmitted request shall contain the name of the person and/or firm filing the request, address, telephone and fax number, Specifications and/or Drawing number, and document title. Bidder isresponsible for the legibility of hand written requests. Pre-bid clarification request shall be filed a minimum of six (6) days prior to bid opening. Requests received less than six (6) days before bid opening shall not be considered or responded to. A written response to timely pre-bid clarifications requests which materially affects the bidders price will be made by Addendum issued by the Colton Joint Unified School District not less than seventy-two (72) hours prior to bid opening Design, Bid, Build. B. Assembly Group A3 and Education Group E, Construction Type V, totaling approximately 54,808 square feet. 1. The Scope of Work shall include the following: a. Upgrade existing Fire Alarm System. Design, Bid, Build. B. Assembly Group A3 and Education Group E, Construction Type V, totaling approximately 54,808 square feet. 1. The Scope of Work shall include the following: a. Upgrade existing Fire Alarm System. 1.3 CONTRACT DOCUMENTS A. Contract Requirements: 1. Conditions of the Contract and other Contact documents have been included in the Project Manual, as indicated in the Table of Contents. a. Such documents are not Specifications. 2. Specifications are found in Divisions 1 through 32 of the Project Manual. B. Contract Drawings: The Drawings provided with and identified in the Project Manual are the Drawings referenced in the Agreement. 1. The location, extent and configuration of the required construction and improvements are shown and noted on Drawings. a. The Drawings are referenced in the Agreement. b. An index of Drawings is included in the set of Drawings. 2. Drawings are arranged into series according to design discipline. Such organization and all references to trades, subcontractor, specialty contractor or supplier shall not control the Contractor in dividing the Work among subcontractors or in establishing the extent of the Work to be performed by any trade. 3. Where the terms "as shown", "as indicated", "as noted", "as detailed", "as scheduled", or terms of like meaning, are used in the Drawings or Specifications, it shall be understood that reference is being made to the Drawings referenced in the Agreement. 4. Where reference to the word "plans" is made anywhere in Drawings, Specifications and related Contract Documents, it shall be understood to mean the Drawings referenced in the Agreement. C. Contract Specifications: The Specifications provided in the Project Manual are the Specifications referenced in the Agreement. 1. Specifications are organized by Divisions and Sections in accordance with the recommended practices of the Construction Specifications Institute

Award

Educational

$679,700.00

Public - City

Renovation

17

19

16

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
100
Bidding Soon
2,215
All Active Projects
1,002
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

May 8, 2023

img_map_placeholder

12066 Vivienda Ave, Grand Terrace, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.