BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Southington, Connecticut. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work includes furnishing, installing and incorporating all materials and equipment into the project as well as performing or providing all labor, supervision, equipment and services unless otherwise noted within the bid documents. "Bid Proposal Form", "Schedule of Prices", "Bid Bond", "Non Collusion Affidavit" and "Bidder's Prequalification" approval letter signed by the CTDOT Contracts Manager (CON-16) for heavy highway work must be completed and returned with the submitted bid. Failure to properly execute and include any one of these five documents in the bid submission will result in the bid not being read and the subsequent rejection of the bid. A Surety Company Bond, on the form furnished in the bid, for at least 10% of the amount of the bid must accompany each proposal. A certified check will not be accepted. Performance and payment bonds at 100% of the contract value are also required once awarded. The bidder agrees that 9% of the awarded contract value shall be performed by Disadvantaged Business Enterprises (DBE) certified by the Connecticut Department of Transportation as a subcontractor or owner operator of construction equipment. The bidder must indicate with their bid, the DBE firm(s) it intends to utilize to meet the above stated percentage and submit the Pre-Award DBE Commitment Approval Request forms with the bid forms. The Town of Southington hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation, and that they will not be discriminated against on the grounds of race, color, national origin or sex, in consideration for this award. All bidders are required to inform themselves fully of the conditions relating to the construction and labor under which the work will be or is now being performed and the Contractor shall employ, as far as possible, such methods and means in the carrying out of this work as will not cause interruption or interference with any other contractor. The Town of Southington reserves the right to reject any and all bids.

Bid Results

Roads / Highways

$2,067,568.00

Public - City

Paving, Site Work

89

9

17

6

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
287
Bidding Soon
4,511
All Active Projects
1,923
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 3, 2023

June 2, 2023

img_map_placeholder

FCHT, Southington, CT

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.