EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 7, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a playground / park / athletic field in Millville, New Jersey. Completed plans call for site work for a playground / park / athletic field.

IN ORDER FOR YOUR BID TO BE CONSIDERED A LEGAL BONAFIDE BIDDER ON THE PROJECT, DOCUMENTS MUST BE PURCHASED FROM REMINGTON, VERNICK ENGINEERS DIRECTLY PAYMENT MUST BE RECEIVED PRIOR TO OBTAINING SAID SPECIFICATIONS, EITHER BY MAIL OR IN PERSON. NO BIDS ARE TO BE DROPPED OFF AT THE ENGINEER'S OFFICE. The Board of Education reserves the right to reject any or all bids, either in whole or in part and also waive any informality in any bid or bids received, in accordance with applicable law. Bids must be on the bid form prepared by Remington and Vernick Engineers, in the manner designated therein and required by the specifications, must be enclosed in sealed envelopes bearing the name and address of the bidder on the outside and also bearing on the outside reference to the particular work bid upon. Said bids shall be addressed to: Mr. Richard Davidson, School Business Administrator, Millville Public Schools, 110 N. Third Street, Millville, New Jersey 08332. All construction must be complete, demobilized, and the site restored on or before august 25, 2023. THE CONTRACTOR SHALL PROVIDE ADDITIONAL CREWS OR WORKFORCE AS NEEDED TO MEET THE MANDATORY PROJECT SCHEDULE AT NO ADDITIONAL COST TO THE OWNER. Each bid shall be accompanied by a certified check, cashier's check or bid bond duly executed by the bidder as principal and having as surety thereon a surety company approved by the Board of Education in an amount not less than ten percent (10%) but in no case in excess of $20,000.00 of the amount bid. Any such bid bond shall be without endorsement or conditions. The bidder must be pre-qualified by the New Jersey Schools Development Authority and the New Jersey Department of the Treasury, Division of Property Management and Construction, and have a valid up-to-date notice of classification prior to the date that bids are received. Any bid submitted under the terms of the New Jersey statutes not including a copy of a valid and active pre-qualification/classification certificate will be rejected as being non-responsive to the bid requirements. Each Bidder will submit will their bid a Certificate of Consent of Surety as per N.J.S.A. 18A:18A-25 from a Surety Company stating that it will provide the bidder, if successful, with a Performance/Payment Bond in the full amount of the contract. The award of the contract shall be made subject to the necessary moneys to do the work being provided by the Millville Board of Education in a lawful manner. The contract to be executed by the successful bidder will provide that it shall not become effective until the necessary moneys to do the work have been provided by the Millville Board of Education in a lawful manner. The award shall further be subjected to the securing of necessary State, Federal or Local permits governing the work.. No bid may be withdrawn for a period of sixty (60) days after the date set for the opening thereof. Bidding shall be in conformance with the applicable requirements of N.J.S.A. 18A:18A-1 et seq., pertaining to the "Public School Contracts Law". All Bidders are placed on notice that they are required to comply with all requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27, Affirmative Action, current regulations, N.J.S.A. 34:11-56.25 et seq., New Jersey Prevailing Wage Act, and American With Disabilities Act of 1990 (42 U.S.C. S12101, et seq.). All Bidders must comply with all requirements of Federal, State and Local and current applicable regulations. The contractor is further notified that he must comply with N.J.S.A. 52:25-24.2 and submit a Disclosure Statement listing stockholders with his bid. The contractor is further notified that he must comply with N.J.S.A. 34:11-56.48 et seq. Public Works Contractor Registration Act and he and any subcontractors must be registered in accordance with the act. The contractor is also further notified that he must comply with N.J.S.A. 52:32-44 and submit proof of business registration and submit proof of business registration for any named subcontractors in accordance with the act. Questions deadline: 4/6/23. Please submit all questions via email to Nicholas DiCosmo at UNicholas.dicosmo@rve.com

Post-Bid

Playgrounds / Parks / Athletic Fields

$2,000,000.00

Public - City

Site Work

75

53

12

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Construction Progress Documentation, Construction Progress Schedule, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Assurance, Manufacturer Qualifications, Installer Qualifications, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Building Demolition
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Concrete Specialties
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications, Metal Railings
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Roofing and Siding Panels, Siding, Flashing and Sheet Metal, Sheet Metal Roofing, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Windows, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Furnishing Accessories, Clocks
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting, Exterior Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Parking Bumpers, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
92
Bidding Soon
1,789
All Active Projects
731
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

June 19, 2023

img_map_placeholder

600 E Broad St, Millville, NJ


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Wheaton Field Improvements Phase 1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.