BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a bridge / tunnel in Tyler, Texas. Completed plans call for site work for a bridge / tunnel.

Smith County Purchasing Director, Jaye Latch, will receive sealed bids at 200 E. Ferguson Street, Ste. 414, Tyler, Texas 75702 for: RB-15-23 Bridge Replacement for CR 370 at Howell Lake. RB-23-23 Roadway Improvements to CR 3111, CR 3118, CR 3119 & CR 3120. RB-26-23 Roadway Improvements to CR 1125 (CR 1113 to Spur 164), CR 1140 and CR 1141 RB-28-23 Roadway Improvements to CR 2191 & CR 2192. RB-29-23 Roadway Improvements to CR 457. Late bids will not be accepted. Specifications are available on Smith County's website: www.smith-county.com under the Purchasing Department, or by email at purchasing@smith-county.com or by calling 903-590-4720. Bids will be opened in the office of the Purchasing Director for award by the Commissioner's Court. Payments will be processed by the County Auditor after notification of satisfactory receipt of items. Smith County reserves the right to award by unit cost or lump sum discount and waive any irregularities or formalities in the best interest of Smith County. Smith County reserves the right to reject any or all bids or to waive any informalities in the bidding. All questions pertaining to this bid shall be addressed in writing to the Purchasing Director, Jaye Latch, at purchasing@smith-county.com. Smith County requests one (1) original copy and one (1) USB flashdrive of your bid. A discretionary allowance has been established in the Bid Proposal for contingencies and extra work which may arise during the construction phase of the project due to the discovery of unknown obstructions or other unexpected project conditions for which a method of payment, such as individual bid item, has not been established. This allowance is not intended to be used to procure payment for items specifically named as subsidiary to other bid items within the contract documents. Prior to initiating any items of extra work under this bid item, the Owner, Engineer, and Contractor will agree as to the scope of extra work to be performed and the amount of payment to be made for the particular item of extra work under consideration. Expenditure of the allowance funds is at the sole discretion of the Owner. The allowance may be used in full or in part as the Owner deems necessary. If no extra work is identified, and approved by the Owner, the allowance funds will not be expended.

Bid Results

Bridges / Tunnels

$887,560.00

Public - County

Site Work

22

8

2

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
41
Active Projects
23
Bidding Soon
642
All Active Projects
267
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2023

April 28, 2023

img_map_placeholder

Multiple Locations, Tyler, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.