BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 14, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Sacramento, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of July 14, 2023, project was awarded to BALDWIN CONTRACTING CO., INC. DBA KNIFE RIVER CONSTRUCTION, awarded amount is $7,000,277.50.** In Yuba County Near Wheatland From 0.2 Mile South Of Main Street To Grasshopper Slough Bridge The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12. 385 Working Days DVBE participation incentive up to $250,000. Small Business Preference applies.

Award

Roads / Highways

$7,000,278.00

Public - State/Provincial

Paving, Site Work

289

7

25

8

Subscribe For Documents

60 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
397
Active Projects
130
Bidding Soon
2,751
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 10, 2023

June 20, 2023

Project location map

Multiple Locations, Sacramento, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.