BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Florence, South Carolina. Completed plans call for the renovation of a water / sewer project.

**As of April 25, 2023, this project has been awarded to Charles R. Underwood Inc for $41,933.13** Clemson University seeks an experienced supplier to provide and install a rear well pump at the Pee Dee Research & Education Center (REC) located at 2200 Pocket Rd. Florence, SC 29506 Offers and offer modifications must be submitted by submitting your offer electronically (b) If you are responding to more than one solicitation, you must submit separate bids for each solicitation. (c) Facsimile, hardcopy, or e-mail offers, modifications, or withdrawals, are NOT authorized Due to the value of this contract, this bid will NOT be opened publicly. Results will be communicated with bidders after evaluation is complete. . SCOPE OF WORK / SPECIFICATIONS Clemson University's Pee Dee Research and Education Center (PD REC)seeks an experienced supplier to provide and install a new Rear Well Pump to include but not limited to all labor, material, and equipment for the below services: Provide & install new Goulds 11CLC-4 pump with new Nidec 60 HP, 460V, 3PH premium efficiency motor. 85.2% eff @ 224' TDH (Total Dynamic Head) & has 321' TDH at shut off. 650 GPM. Pump bowl setting 220'. NSF61 Certified. Pump Construction: 1. Bowl Assembly: The bowls shall be flanged type constructed of close-grained cast iron conforming to ASTM A48, class 30. They shall be free from sand holes, blowholes, or other faults and must be accurately machined and fitted to close tolerances. They shall be capable of withstanding a hydrostatic pressure equal to twice the pressure at rated flow or 1.5 times shut-off head, whichever is greater. The intermediate bowls shall have enamel or epoxy-lined waterways for maximum efficiency and wear protection. All intermediate bowls shall be of identical design for interchangeability. A discharge bowl shall be used to connect bowl assembly to the discharge column. All the bowls (including the discharge bowl) shall be fitted with sleeve-type bearings of bronze alloy C89835. 2. Impellers: The impellers shall be constructed from ASTM B584 Silicon Bronze and shall be the enclosed (or semi-open) type. They shall be free from defects and must be accurately cast, machined, and filed for optimum performance and minimum vibration. Impellers shall be balanced to grade G6.3 of ISO 1940 as a minimum. They shall be securely fastened to the bowl shaft with taper locks of C1018 steel. 3. Suction: The suction bowl shall be provided with a non-soluble grease-packed bronze bearing. A bronze sand collar shall be provided to protect this bearing from abrasives in the pumping fluids. The bearing housing shall have sufficient opening at the bottom for easy removal of the bearing. 4. Shaft: The bowl shaft shall be constructed from ASTM 582 type 416 stainless steel. It shall be precision ground and polished with a surface finish better than 40 RMS. Question Cuttoff Date & Time 4/4/2023 12:00:00 PM (ET)

Award

Water / Sewer

$41,933.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
116
Bidding Soon
1,424
All Active Projects
609
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2023

May 11, 2023

img_map_placeholder

2200 E Pocket Rd, Florence, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.