Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Pueblo, Colorado. Contact the soliciting agency for additional information.
All cast iron fittings shall conform to AWWA C110 and/or AWWA C153, latest revision, 2- inch to 48-inch, for 250 psi water pressure plus water hammer. Fittings larger than 12-inch shall be Class 150. All fittings except plugs and sleeves shall be cement lined to conform to AWWA C104 latest revision, with a bituminous seal coat or shall be coated with fusion bonded epoxy coating of 6 mils. Approved epoxy coatings are: 3M #303, Indurall #3300, Mueller HP, P & L Vitralon #88-983, Keysite 740, Rust-Oleum 9500, Al-Clad 0278, Polymer Corporation Corvel 531-6088, Scotchkote 206N, Tnemec Company Series 20 Pota-Pox (two-part), or other epoxy coating approved by Pueblo Water. The One Bolt Inc. fittings (4" - 12"), or Pueblo Water approved equal, may also be accepted with the following requirements: o Comply with AWWA Standards C153/A21.53-19, C111/A21.11-17, and C116/A21.16- 15, or latest revision thereto. o Comply with ASTM D3139, F1674 and F477, latest revision. o All fittings shall be coated with fusion bonded epoxy coating of 6 mils. No exception. o The bid shall be accompanied by a letter from the manufacturer certifying the epoxy coating is 6 mil.
Post-Bid
Industrial
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2023
May 4, 2023
Multiple Locations, Pueblo, CO
Related To This Project
Pueblo, CO
--
Pueblo, CO
Bid Date: Apr 11 2023
Pueblo, CO
Bid Date: Apr 20 2023
Pueblo, CO
Bid Date: Apr 12 2023
Pueblo, CO
Bid Date: Apr 06 2023
Pueblo, CO
Bid Date: Apr 12 2023
Pueblo, CO
Bid Date: Apr 21 2023
Pueblo, CO
Bid Date: Apr 14 2023
Pueblo, CO
Bid Date: Mar 29 2023
Pueblo, CO
Bid Date: Mar 29 2023
Pueblo, CO
Bid Date: Apr 03 2023
Pueblo, CO
Bid Date: Mar 15 2023
Pueblo, CO
Bid Date: Mar 15 2023
Pueblo, CO
Bid Date: Apr 24 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.