BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a transportation facility in Iowa City, Iowa. Completed plans call for paving for a transportation facility; for site work for a transportation facility; and for outdoor lighting for a transportation facility.

Construction of 300 ft runway pavement extension and displacement of Runway 12 threshold 500 ft. This project will include replacing Runway 12/30 lighting and re-painting of the entire runway. Each bidder shall accompany its bid with bid security, as defined in Iowa Code Section 26.8, as security that the successful bidder will enter into a contract for the work bid upon. The bidder's security shall be in an amount equal to 5% percent of the total amount of the bid. The bid shall contain no condition except as provided in the specifications. If the bidder fails to execute the contract and to furnish an acceptable performance and payment bond or provide a Certificate of Insurance within ten (10) days after acceptance of the bid by the Iowa City Airport Commission, the bid security may be forfeited or cashed by the Iowa City Airport Commission as liquidated damages. The Iowa City Airport Commission reserves the right to reject any and all bids, to waive informalities or technicalities in any bid, and toenter into such contract, or contracts, as it shall deem to be to the best interest of the Iowa City Airport Commission. Goals for minority participation for each trade: 1.5% Goals for female participation in each trade: 6.9 % Phase 1 shall be defined asthe work along Runway 12/30 not within the Runway Object Free Zone for Runway 07/25 or Taxiway Object Free Area for Taxiway A. Work under Phase 1 shall be completed in Forty (40) working days. Phase 2 shall be defined as the work along Runway 12/30 within the Taxiway Object Free Area for Taxiway A. Work under Phase 2 shall be completed in five (5) working days. Phase 2 work shall be completed concurrently with Phase 1 work. The maximum total amount of working days allotted for the contract is 40 working days. Phase 3 work shall be completed concurrently with Phase 1 work. The maximum total amount of working days allotted for the contract is Forty (40) working days.

Bid Results

Transportation Terminals

$872,228.00

Public - City

Outdoor Lighting, Paving, Site Work

40

12

6

8

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
29
Bidding Soon
484
All Active Projects
220
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2023

May 15, 2023

img_map_placeholder

1801 S Riverside Dr, Iowa City, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.