BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 13, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Dayton, Indiana. Working plans call for the renovation of a 9,857-square-foot educational facility.

**As of April 4, 2023, No bid received for the project. No definite date for the rebid.**  A general description of the work for which proposals are to be received consists of: Renovations to selected restroom pods at two school buildings. This includes new fixtures, finishes and room configuration. Some pods will grow in size to accomplish these goals. The project also includes new ceiling work in the main entry at McCutcheon High School. All work shall be in accordance with the Bidding Documents, including the Specifications and the Construction Drawings. Renovating and updating select restroom pods to modernize them at two schools. This consists of replacing restroom fixtures, finishes, ceilings and lighting; bringing the restroom pods up to modern standards. Additional work at McCutcheon is to renovate the ceilings and lights in the main entry corridor. Locations- Dayton Elementary School - Address: 730 College St, Dayton, IN 47941, United States; McCutcheon High School - 4951 US-231, Lafayette, IN 47909, It is the intention of the Owner that construction of this project will start on Tuesday, May 30th, 2023. All work shall be completed by Friday, August 4th,2023. Send all questions during bidding to Justin Sorber at Cordogan Clark, jsorber@cordoganclark.com. ALTERNATE #1 : DAYTON CLINIC FINISHES - 1) Replace the finishes in the main Clinic area at Dayton. This includes the VCT flooring, wall base, paint, ceiling grid system, lights and cubicle curtain track. ALTERNATE #2: DAYTON SPECIAL ED RESTROOM - 2) Replace the finishes in the Special Ed Restroom at Dayton. This includes wall base, grab bars, paint, ceiling grid system and lights. ALTERNATE #3: McCutcheon English restroom pod- 3) Include all work associated with demolition and new construction for the restrooms noted, within the English classroom pod at McCutcheon. ALTERNATE #4: McCutcheon additional corridor ceilings - 4) Include all work associated with demolition and new ceilings and lights at McCutcheon in the main corridor

Final Planning

Educational

$155,000.00

Public - County

Renovation

50

19

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
42
Active Projects
1
Bidding Soon
741
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2023

October 13, 2023

Project location map

Multiple Locations, Dayton, IN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.