Renovation of a water / sewer project in Hazleton, Pennsylvania. Completed plans call for the renovation of a water / sewer project.

As of May 17, 2023, the project has been awarded. A timeline for construction has not been confirmed. Clarification Deadline: 4/20/2023 3:00 PM For the HCA - Oneida Junction Booster Station Project. In general work includes the supply of materials and installation for a water booster station building and pumping equipment. A certified check or bid bond drawn to the order of the Hazleton City Authority - Water Department in an amount equal to ten percent (10%) of the bid must be submitted with each proposal as bid security and received at the Authority's Office with all other required bid documents prior to the Bid Opening. Bidders shall comply with all procedures and requirements of the Contract Documents. The HCA encourage DBEs, including MBEs and WBEs, to submit a bid proposal. All Prime and sub-contractors shall make the required good faith efforts when subcontracting and shall provide all documents to substantiate their search prior to award. Prior to the award of any Contract, the successful bidder shall furnish to the Owner Certificates of Insurance, Performance Bond, Labor and Material Payment Bond, American Steel certifications, DBE/WBE Compliance Documents, and any other items as required by the Contract Documents. A satisfactory surety shall execute all bonds. Bidders on all work will be required to comply with the Pennsylvania Human Relations Act No. 222. The Commonwealth of Pennsylvania, Department of Labor and Industry and Federal Prevailing Minimum Davis Bacon Wage Determinations, which are included as, part of the Contract Documents. All required wage rates for this project and shall govern all work under this Contract. The Hazleton City Authority - Water Department is an Equal Employment Opportunity Employer. Except as otherwise provided by law, no Bidder may withdraw a bid within sixty (60) consecutive calendar days after the actual date of the bid opening or one hundred twenty (120) consecutive calendar days if the award is delayed by a required approval of another governmental agency, the sale of bonds, or the award of a grant or grants. The Hazleton City Authority is a Pennsylvania Municipal Authority and subject to the Pennsylvania Right to Know Act. All prospective bidders shall execute a waiver of the Application of the Uniform Electronic Transactions Act, 73 P.S. 2260.101 et seq., and the Electronic Signatures in Global and National Commerce Act, 15 U.S.C.S. 7001 et seq. The Hazleton City Authority - Water Department hereby reserves the right in its discretion, which is understood and agreed to by all bidders, to reject any and all bids submitted, and also reserves the right to waive any irregularities, omissions, mistakes, or informality in the Bidding Process. The Bid, if awarded, will be awarded at the sole discretion of the Authority at the lowest total cost to the best responsive and responsible Bidder based on a final review work to be awarded as selected by the Owner. All bidders must show adequate knowledge, experience and past projects in similar size and complexity. Contract A - General/Mechanical Contract B - Electrical/HVAC 1. Oneida Junction Booster Station Project (Contract A - General/Mechanical): Construct Booster station building, install four (4) new water pumps with motor controllers, associated piping/appurtenances like butterfly valves, check valves, and strainers. The project also consists of site grading, stone driveway, security fence, meter vault and water meter, connection to existing HCA distribution system, and pipe stub for SR 309 extension. The project includes coordination with Contract B - Electrical/HVAC contractor, and all other associated work. 2. Oneida Junction Booster Station Project (Contract B - Electrical/HVAC): Supply and install all materials necessary to provide power to the proposed booster station, supply and install the emergency generator and pad, provide transformer pad, coordinate with Utility Provider, install conduits and wires, CT Cabinet and meter base, main circuit breaker and distribution panel, and automatic transfer switch. This contract also includes the supply and installation of all lighting fixtures, heating equipment, wall mounted fans, and louvers. The project includes the necessary materials to power the pump systems, motor controls and SCADA equipment and towers and antennas. The project includes coordination with Contract A - General/Mechanical contractor, and all other associated work.

Award

Water / Sewer

$573,700.00

Public - City

Renovation

31

53

19

7

Subscribe For Documents

105 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Procedures, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Masonry, Maintenance of Masonry, Stone Cleaning, Stone Restoration, Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Wood, Plastics, and Composites, Common Work Results for Wood, Plastics, and Composites, Rough Carpentry, Shop-Fabricated Structural Wood
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting, Interior Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Wall and Door Protection
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Athletic Equipment, Recreational Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Bedroom Furnishings, Blankets
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, Meters and Gages for Plumbing Piping, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Meters and Gages for HVAC Piping, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, Steam and Condensate Piping and Pumps, Steam and Condensate Heating Piping, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment, Convection Heating and Cooling Units, Unit Heaters
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Control-Voltage Electrical Power Cables, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications, Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Soil Treatment, Rodent Control, Shoring and Underpinning, Shoring, Sheet Piling, Excavation Support and Protection
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation Signaling and Control Equipment, Railway Signaling and Control Equipment, Supervisory Control and Data Acquisition
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
221
Active Projects
124
Bidding Soon
1,777
All Active Projects
813
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

June 26, 2023

img_map_placeholder

400 E Arthur Gardner Pkwy, Hazleton, PA


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Oneida Junction Booster Station Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.