Published August 11, 2025 at 8:00 PM

Updated August 12, 2025

Site work and paving for a mixed-use development in Austin, Texas. Completed plans call for site work for a water / sewer project.

As of August 11, 2025, this project has not yet been awarded. A timeline for award has not yet been established. The Work consists of installation of approximately 1,837 LF of 18" to 42" storm sewers, 2,768 LF of box culverts, 2,311 LF of 2" to 12" water and wastewater lines, 10,901 SY of HMAC and associated manholes, junction boxes and curb inlets, the construction of a roundabout and new or upgraded bicycle and pedestrian facilities at the Del Curto/Bluebonnet intersection to enhance safety and traffic operations. This work also includes the removal of existing sidewalk, removal and replacement of existing curb and gutter, construction of ADA compliant shared-use paths, pavement mill and overlay, new street pavement marking and new ramps All Bids shall be accompanied by an acceptable Bid guaranty in an amount of not less than five percent (5%) of the total Bid, as specified in Section 00100, Instructions to Bidders Performance and payment bonds when required shall be executed on forms furnished by OWNER. Each bond shall be issued in an amount of one hundred percent (100%) of the Contract Amount by a solvent corporate surety company authorized to do business in the State of Texas, and shall meet any other requirements established by law or by OWNER pursuant to applicable law. Contract Time is of the essence and all Work shall be substantially completed within seven hundred thirty-two (732) Calendar Days after date specified in the Notice to Proceed, in accordance with the Bid Form, Section 00300. Final completion shall be achieved within sixty (60) Calendar Days after substantial completion. Liquidated damages are one thousand two hundred eighty dollars ($1280) per Calendar Day for failure to substantially complete the work and eight hundred sixty dollars ($860) per Calendar Day for failure to achieve final completion within sixty (60) Calendar Days after substantial completion, in accordance with the Bid Form,

Bid Results

Water / Sewer

$8,781,521.00

Public - City

Paving, Site Work

180

28

15

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
331
Active Projects
92
Bidding Soon
2,840
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2025

September 10, 2025

Project location map

2306 Del Curto Rd, Austin, TX


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.