Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Paullina, Iowa. Completed plans call for the renovation of a educational facility.
The work under the Contract shall be commenced on or before a date to be specified in the Contract or written Notice to Proceed of the Owner, and shall achieve Substantial Completion by October 31, 2023. Project Scope: The Work of the Project is defined by the Contract Documents and consists of the following bid packages: 1. Demolition of doors/frames/hardware/glazing. 2. Wall, door frame, and floor patching. 3. Infill wall construction. 4. Installation of new doors/frames/hardware/glazing. 5. Temporary barriers and protective measures as necessary. 6. Removal and disposal of all construction debris. 7. Final cleaning. Bids will be publicly opened by the District and publicly read by the Architect, on said date and will be acted upon by the Owner at such later time and place as may then be fixed State Sales Tax: This project is tax exempt. Do Not include State Sales Tax in any calculation of Bid totals. Contractor will be provided with Iowa sales tax exemption number for this project. Each Bid shall be made on a form furnished by the Architect, and must be accompanied by a certified check or cashiers check drawn on an Iowa bank, or Bid Bond to be executed by corporation authorized to contract as a surety in the State of Iowa, in the amount equal to five percent (5%) of the amount of the Bid, made payable to the South O Brien Community School District, Paullina, IA and may be cashed by the District as liquidated damages in the event that the successful bidder fails to enter into a Contract and file a bond satisfactory to the District assuring the faithful fulfillment of the Contract and maintenance of said improvements as required by the law, the provisions of this Notice and Contract Documents within (10) days after acceptance of the lowest responsive, responsible bid. All bids shall be sealed and plainly marked. Any alteration of the Bid Form may be cause for rejection of the bid. A Pre-Bid Conference meeting, both facilities will be available for bidders to walk through and inspect, during which the Architect and Owner will be available for questions. Monthly estimates will be paid to the Contractor as the work progresses in amounts equal to ninety-five percent (95%) of the Contract value of the work completed during the preceding calendar month, including the actual cost (exclusive of overhead or profit to the Contractor) of materials and equipment of a permanent nature to be incorporated in the work and delivered to and stored at the job site. Such monthly payments shall in no way be construed as an act of acceptance for any part of the work, partially or totally completed. Final payment of the five percent (5%) due each Contractor will be made upon final acceptance of the work under the respective Contract by the District, and after receipt of satisfactory evidence that all claims pertaining to such Contract have been paid in full as provided in the Contract Document for said work
Post-Bid
Educational
$300,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 18, 2023
May 18, 2023
Multiple Locations, Paullina, IA
Related To This Project
Paullina, IA
Bid Date: Dec 02 2021
Paullina, IA
Bid Date: Jan 11 2024
Paullina, IA
Bid Date: Mar 19 2024
Paullina, IA
Bid Date: May 01 2024
Paullina, IA
Bid Date: Jul 30 2024
Paullina, IA
Bid Date: Apr 11 2023
Paullina, IA
Bid Date: Mar 10 2023
Paullina, IA
Bid Date: May 12 2022
Paullina, IA
Bid Date: Oct 18 2022
Des Moines, IA
Bid Date: May 02 2023
Newton, IA
Bid Date: Apr 20 2023
Eldridge, IA
Bid Date: Apr 03 2023
Clive, IA
Bid Date: Apr 05 2023
Clive, IA
Bid Date: May 31 2023
Bondurant, IA
Bid Date: Apr 12 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.