BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work and paving for a road / highway in Paulding, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2023 Paulding County Chip Seal - Engineer's Estimate: $327,062 Project 1. Blue Creek Township - 1) Single Seal Coat-HFRS-2P W/ Fog TR 48 from TR 91 to TR 59 2) Fog Seal - SS-1 Dilute - TR 24 from US 127 to TR 59 Project 2. Crane Township 1) Single Seal Coat - TR 192 from TR 99 to West 2) Double Seal Coat - TR 8 from CR 85 to West Project 3 Emerald Township 1) Single Seal Coat - HFRS-2-P2 2) Single Seal Coat- HFRS-2P 3) Single Seal Coat - HFRS-2P Project 4 Harrison Township - 1) Single Seal Coat -HFRS 2-P w/ Fog 2) Single Seal Coat - HFRS 2-P w/ Fog Project 5. Jackson Township- 1) Double Seal Coat - MC30/HFRS-2P 2) Single Seal Coat - HFRS -2 3) Single Seal Coat -HFRS2P Project 6 Paulding Township- ) Single Seal Coat - HFRS-2P w/ Fog TR 98 from TR 95 to TR 81 (10,685'x 16') 2) Single Seal Coat -HFRS-2P w/ Fog TR 82 from CR 71 to TR 59 (5060'x16') 3) Single Seal Coat - HFRS-2P w/ Fog TR 113 from TR 82 to TR 84 (2650' x 16') Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with Section 153.54 of the Ohio Revised Code. Bid security furnished in Bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provide said surety. Each Proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. The owner intends and requires that this project be completed as listed above. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor's Executive Order of 1972, and Governor's Executive Order 84-9 shall be required. All contractors shall follow all applicable Federal and State OSHA regulations. The contractor shall also hold the County Engineer harmless for any violations or fines received while engaged in this project. All contractors must provide current Certificate of Liability Insurance Coverage for $1,000,000 along with a current Certificate of Worker's Compensation Coverage, before they can be hired to perform any type of work for the Paulding County. Bidders must comply with the prevailing wage rates on Public Improvements in Paulding County, Ohio as determined by the Ohio Department of Industrial Relations. All materials shall conform to the latest revision of the State of Ohio Department of Transportation Construction and Material Specifications. Sealed bids shall be in writing and in accordance with specifications furnished by Paulding County and on file in the Offices of the Paulding County Engineer and Commissioners. The Board of County Commissioners reserves the right to reject any and/or all bids received. Scope: Prime Coat - This work will require laying a Prime Coat using MC30 bituminous material in accordance with Item 408 in the latest Revision of the ODOT Construction and Material Specifications. Single Seal Coat HFRS 2P - This work will require laying a Seal Coat using HFRS 2P bituminous material and No. 8 Aggregate in accordance with Item 409 in the latest Revision of the ODOT Construction and Material Specifications. Rollers shall be Type II pneumatic tire. Double Seal Coat - This work will require lying a Seal Coat using HFRS-2P bituminous material and No. 67 Aggregate and after curing laying a Seal Coat using HFRS-2P bituminous material and No. 8 Aggregate in accordance with Item 409 in the latest Revision of the ODOT Construction and Material Specifications. Steel wheel rollers may be used in conjunction with Type II pneumatic tire rollers. Fog Seal Coat - SS-1 Dilute Fog Seal Coat to be applied within 10 calendar days of completion of the single seal coat. Project Completion Date is AUGUST 31, 2023

Bid Results

Roads / Highways

$272,038.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
78
Active Projects
53
Bidding Soon
647
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2023

May 5, 2023

img_map_placeholder

Multiple Locations, Paulding, OH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.