BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Munising, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Construct approximately 5,280 (1 mile) feet of single-track non-motorized hiking/mountain bike trail at Valley Spur following sustainable trail standards set by the International Mountain Bike Association (IMBA) and the Forest Service Trail Construction and Maintenance Handbook. This project is estimated to be between $25,000 and $100,000 Project is a total small business set-aside, NAICS code 237990, size standard $45M. If project exceeds $35,000 a payment bond will be required. Offerors are encouraged to submit all questions in writing at least five (5) days prior to the conference Question Deadline 04/19/2023 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. complete the entire work ready for use not later than November 1, 2023. Construct approximately 5,280 (1 mile) feet of single-track non-motorized hiking/mountain bike trail at Valley Spur following sustainable trail standards set by the International Mountain Bike Association (IMBA) and the Forest Service Trail Construction and Maintenance Handbook. The following implementation standards also apply: -Stay as close to the flagging (pink) that has been installed by Forest Service as possible when constructing the trail. -Construct when possible: slopes that are less than 7%, out-sloped, rolling grade dips and grade reversals that are intended to shed water off the trail. -Trail corridors constructed shall have width limits of 36" to 48" with the trail tread shall be no greater than 24" wide. -The building of trail features are encouraged (berms & rollers) if possible. -Contractor shall move all brush at least 20 feet away from trail or further and brush shall not exceed 24' in depth. -Flush cut all stumps and at ground level. -Flush cut all branches to trunk of tree. -Pull all pin flags/flagging and pack out all garbage. -Trail construction may be completed using machines (mini-excavator, mini-skid steer), hand tools, or a combination of both. -Daily diaries will be conducted by Contracting Officer Representative (COR) assigned to the contract to make sure implementation of the re-routes are adhering to the International Mountain Bike Association (IMBA) and the Forest Service Trail Construction and Maintenance Handbook. -Contractor shall store all equipment/tools in a centrally designated location at on each trail reroute segment during the contract performance period. -Contractor shall sign the entrance and exiting points of the trail sections during construction as closed to the public and direct folks accordingly to the open section of trail. Contractor will communicate to the COR when trail benchmarks are met. -In addition to following sustainable trail building practices, the trail tread must be of native mineral soil, with flowy transitions, accessibility in both directions, suitable for novice to intermediate riding skill levels, -Keep all gates closed if applicable

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - Federal

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
7
Bidding Soon
127
All Active Projects
32
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 24, 2023

May 24, 2023

November 1, 2023

img_map_placeholder

To Be Determined, Munising, MI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.