BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 25, 2025

Renovation of an educational facility in Windsor, Connecticut. Conceptual plans call for the renovation of a educational facility.

UPDATE :The existing WHS Fieldhouse was built in 1968 and measures 6,750 sq. ft. It is located on O'Brien Field. It is in its original condition except for in 2015 when the boiler was replaced, buried heating oil tank removed and natural gas added to facility. The complete interior, snack stand, and public restrooms need to be renovated to existing codes for each specific use. The roof was last replaced in 1994 and is currently out of warranty. This project would entail new interior space design, restrooms, showers, hvac systems, roof, and removal of hazardous materials. Project is in Town of Windsor capital budget fy 2025-2030 CIP ________________________________________________________________________ South Windsor High School field upgrades get design approval, but funding still pending April 28, 2024 | Joseph Villanova Under the PZC's approval, officials must monitor noise levels around the field over the first year and construct sound barriers if any issues arise, and any loudspeakers used on the field must face away from residential neighbors. ____________________________________ The existing WHS Fieldhouse was built in 1968 and measures 6,750 sq. ft. It is located on O'Brien Field. It is in its original condition except for in 2015 when the boiler was replaced, buried heating oil tank removed and natural gas was added to the facility. The complete interior, snack stand and public restrooms need to be a warranty is expired. This project would entail new interior space design, restrooms, showers, HVAC systems, roof and removal of hazardous materials. First in Connecticut. First for its citizens. Project is included Town of Windsor FY 2023-2028 Budget CIP. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Educational

$8,230,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2030

Project location map

50 Sage Park Rd, Windsor, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.