BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Winnipeg, Manitoba. Completed plans call for the renovation of a water / sewer project.

D2.1 The Work to be done under the Contract shall consist of Migrating the NEWPCC existing Distributed Control system to a PLC-based Process Control System. The scope of work includes server and client configuration; domain controller configuration; workstation configuration; Turbo Ring v2 network configuration; installation, configuration Schneider M580 PLCs using ControlExpert; panel fabrication; installation and configuration of an AVEVA PlantSCADA and AVEVA Historian based Process Control System; and integration of existing PLCs and HMIs for the entire site, including the Headworks Facility, the Interim P area and the Primary Clarifier Upgrade Projects, which are currently under construction. D2.3 Notwithstanding D2.1, the type and quantity of Work to be performed under this Contract is subject to annual approval of monies therefore in a budget by Council. Proponents are advised that monies have been approved for work up to and including December 31, 2023. D2.3.1 In the event that Council does not approve the annual budget for any year during this Contract, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon one hundred and twenty (120) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made against the City for damages of any kind resulting from the termination, including, but not limited to, on the ground of loss of anticipated profit on Work. D2.4 Notwithstanding D2.1, in the event that operational changes result in substantial changes to the requirements for Work, the City reserves the right to alter the type or quantity of work performed under this Contract, or to terminate the Contract, upon thirty (30) Calendar Days written notice by the Contract Administrator. In such an event, no claim may be made for damages on the ground of loss of anticipated profit on Work. The funds available for this Contract are $12,000,000.00. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. The City intends to award this Contract by June 9, 2023.

Post-Bid

Water / Sewer

$12,000,000.00

Public - City

Renovation

90

60

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
20
Active Projects
5
Bidding Soon
211
All Active Projects
52
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2023

June 19, 2023

img_map_placeholder

2230 Main St, Winnipeg, MB

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.