BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Egg Harbor Township, New Jersey. Completed plans call for the renovation of a library.

Atlantic County will not be held responsible for vendors not receiving general information due to their not attending any pre-bid meetings. Prospective Bidders Shall Ensure That Any Questions They Have Concerning This Project Be Brought Up at the Pre-bid Conference. Questions Pertaining to the Plans or Specifications Asked After the Pre-bid May or May Not Be Addressed Depending on Available Time. Bids shall be received online only through the website. No paper submission will be accepted Any questions concerning this specification must be submitted in writing through the website electronic bidding portal question section of the specific bid Questions must be submitted no later than April 14, 2023 Bidders are required to comply with requirements of NJSA 10:5-31 et seq. and N.J.A.C. 17:27. Every bidder must abide by the New Jersey Prevailing Wage Act,. NJSA 34:11-56.27 et seq. Scope- a. Site clearing and leveling as required to accommodate the construction of the proposed emergency generator. b. Removal of existing mechanical systems indicated, including, but not limited to water source heat pumps, hot water boilers, cooling tower and associated components. c. Removal of gypsum wall board construction as delineated within the construction drawings and as required to complete the scope of the work. d. Removal of existing suspended acoustic panel ceiling systems as delineated within the construction drawings and as required to complete the scope of the work. e. Removal of existing sealants as delineated and required to accommodate the application of new sealants. f. Preparation of existing framed exterior wall construction and exterior metal soffits as required to accommodate the installation of the mechanical systems proposed. Preparation shall include, but is not limited to modifications to the existing masonry veneer and metal soffit systems. g. Repair, patching and preparation of existing wall surfaces as required to accommodate the proposed construction, and as required to accept the specified finishes. h. Removal and relocation of existing electrical systems indicated and required for the performance of the proposed work. i. Removal and disposal of the existing generator and associated equipment as designated. j. Removal and disposal of any and all abandoned or unused conduit, raceway and piping. Scope of the work shall further include the removal of all associated fasteners and anchors, patching of penetrations, and touch-up paint of patched construction. k. Primary electrical service disconnect, coordination with the local utility company. l. Cutting and patching of existing concrete and asphalt paved surfaces as required to accommodate the installation of new generator, transfer switch and support services. m. Removal and relocation of existing electrical, plumbing and mechanical systems indicatedand as may be required for the performance of the proposed work. n. Cleaning of the site. It shall be the responsibility of the contractor to completely clear the work area of ALL demolition debris. Cleaning of the site shall take place on a daily basis, with all construction and demolition debris, trash receptacles and containers removed from the from the site each day. o. Notify the Owner and Architect in the event that hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling and protection against exposure or environmental pollution. p. Protection of all existing improvements to remain, and not specifically designated for demolition. Damage to existing buildings, grounds and improvements resulting from the work of this contract shall be shall be repaired and restored at no expense to the Owner. q. Protection of the project site, including but not limited to the installation of barriers and guards as required to protect staff and visitors to the site. Substantial completion - 280) consecutive calendar days Final Completion- 294) consecutive calendar days LOCATED AT 1 SWIFT DRIVE EGG HARBOR TOWNSHIP, NJ 08234

Award

Library

$1,998,600.00

Public - County

Renovation

22

24

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
82
Bidding Soon
1,512
All Active Projects
664
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 29, 2023

img_map_placeholder

1 Swift Dr, Egg Harbor Township, NJ

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.