Site work for a water / sewer project in New Braunfels, Texas. Completed plans call for site work for a water / sewer project.

NBU anticipates the following items will be included in the Project scope of work: (i) reconstruction and rehabilitation of the existing lift station wet well; (ii) expanding capacity to 2.8 million gallons per day of total pumping capacity by installing three (3) vertical dry pit solids handling pumps; (iii) installation of necessary instrumentation, controls, and electrical upgrades; (iv) site improvements including general flood-proofing of the site, including hatch replacement and ventilation of existing lift station; (v) existing manhole rehabilitation; (vi) bypass pumping and flow management; (vii) installation of approximately 25 linear feet of cured-in-place pipe lining for the existing 24-inch main; (viii) storm water pollution prevention; (ix) site restoration including hydro-mulching and sod restoration; and (x) all other appurtenances necessary to complete the Project. Project Duration NBU has established a target commencement date for construction activities of the Project as July 15, 2023. The projected completion date is estimated to be Two Hundred and Ten (210) calendar days from the Notice to Proceed date. NBU reserves the right to phase the construction of the Project or modify the schedule as needed and determined by the NBU Board or staff due to modifications in scope. Bid Bond Required Each bid must be accompanied by an approved Bid Bond in the amount of 5% of the bid cost, payable to NBU without recourse, as a guarantee bidder will enter into a contract at the stated price. The successful bidder must execute 100% performance and payment bonds on the forms provided within ten (10) days after the contract has been awarded. Question Deadline 03/27/2023 at 4:00 PM CT

Bid Results

Water / Sewer

$1,398,920.00

Public - City

Site Work

31

23

20

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
29
Bidding Soon
2,335
All Active Projects
905
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 6, 2023

July 15, 2023

img_map_placeholder

3700 FM482, New Braunfels, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.