BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Lebanon, New Hampshire. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The project includes a full depth roadway reconstruction including new replacement water, sewer, and drainage systems for approximately 1300 ft of Kimball Street and approximately 1300 ft of Forest Avenue. The proposed project includes the following: Replacement of the existing 6, 8, 12, and 15-inch VCP and PVC sewer main with 6, 8, 12, and 15-inch PVC (SDR-35) sewer main. Replacement of the existing 6, 8, and 10-inch cast iron water main with 8 and 12-inch ductile iron water main. Replacement of the existing 6, 8, 12, and 15-inch PVC and VCP stormwater pipe with 16-inch ductile iron and 12, 18, 24, and 30-inch Polypropylene stormwater pipe. Installation of a new roadway box (4.5" pavement, 6" crushed stone (fine gradation), 12" crushed stone (coarse gradation), with spot locations of 12" sand), curbs, and sidewalks on Kimball Street. A staging area of approximately 12,000 sq ft of existing gravel parking area off of Spring Street is also included in the project limits and resource analyses completed to date. There is approximately 5,000 SF of impacts outside the Right of Way (ROW): mostly driveway, walkway, and grading (slope and yard) construction activities. Existing sidewalk at the corner of Kimball and Shaw is outside the ROW and is being replaced. Existing manhole and drainage on Forest from 506+50 to 506+90 RT is outside the ROW and is being replaced. Existing 12" drainage and manhole from Forest (Sta. 506+50 RT) to Shaw (Sta. 40+80 LT) is being filled and abandoned. Existing 10" waterline from Kimball (Sta. 211+85 RT) to Forest (508+25 LT) is being filled and abandoned. Contractor Selection Date:May 10, 2023 Question Submission Deadline:April 12, 2023, 10:00am Question Response Deadline:April 18, 2023, 12:00pm Substantial Completion:May 23, 2024 Extended Question Submission Deadline May 8, 2023, 10:00am Bid Results: Kimball Street Nott's Excavating, Inc $2,838,091.00 ForestAvenue Nott's Excavating, Inc $1,980,106.20 Question Response Deadline May 11, 2023, 12:00pm

Award

Roads / Highways

$4,818,197.00

Public - City

Paving, Site Work

101

17

6

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
70
Bidding Soon
924
All Active Projects
374
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 18, 2023

July 17, 2023

img_map_placeholder

Kimball St & Forest Ave, Lebanon, NH

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.