Site work for a civil project in Kapolei, Hawaii. Completed plans call for site work for a water / sewer project.

The scope of work for this project consists of repairing the damaged trench drain and furnishing grating at Pier 5 at Kalaeloa Barbers Point Harbor, Oahu, Hawaii. The estimated construction cost is between $500,000.00 and $750,000.00 To be eligible for award, bidders must possess a valid State of Hawaii General Engineering Contractor's "A" license at the time of bidding The GENERAL PROVISIONS dated 2016 applicable to this project are available on the internet All questions and requests for information (RFI) applicable to the bid documents shall be submitted via HIePRO no later than 14 calendar days before bid opening. Questions received after the deadline will not be addressed. Verbal RFI will not receive a response. Apprenticeship Preference. A 5% bid adjustment for bidders that are parties to apprenticeship agreements pursuant to 103D-55.6, Hawaii Revised Statutes (HRS), is applicable to this project Employment of State Residents on Construction Procurement Contracts. Compliance with 103B-3, HRS, is a requirement for this project whereby a minimum of 80% of the bidder s work force on this project must consist of Hawaii residents Campaign Contributions by State and County Contractors. Contractors are hereby notified of the applicability of 11-355, HRS, which states that campaign contributions are prohibited from specified State or County government contractors during the term of the contract if the contractors are paid with funds appropriated by a legislative body. For more information, contact the Campaign Spending Commission at (808) 586-0285 Protests. Any protest of this solicitation shall be submitted in writing to the Director of Transportation, in accordance with 103D-701, HRS, and 3-126, Hawaii Administrative Rules. The Equal Employment Opportunity Regulations of the Secretary of Labor implementing Executive Order 11246, as amended, shall be complied with on this project. The US. Department of Transportation Regulation entitles :Nondiscrimination in Federally-Assisted Programs of the U.S Department of Transportation," Title 49, Code of Federal Regulations (CFR), Part 21, is applicable to this project. Bidders are hereby notified that the State Department of Transportation will affirmatively ensure that the contract entered into pursuant to this advertisement will be awarded to the lowest responsible bidder without discrimination on the grounds of race, color, national origin, or sex (as directed by 23 CFR, Part 200). For additional information, contact Mr. Legaspi as noted above. The State reserves the right to reject any or all proposals and to waive any defects in said proposals for the best interest of the public *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK - The major items of work to be done include, but are not limited to the following: A. Mobilization and demobilization. B. Trench drain repairs. C. Furnishing and delivering 10 trench drain gratings to a designated location at Kalaeloa Barbers Point Harbor. 10.3 CONTRACT DRAWINGS - The location and size of the repair area shown on the plan are approximate and are included for bidding purposes only. All structures and portions of structures shown on the plan are existing unless specifically noted. Existing conditions shown are based on the best available information. No guarantee is given that they are more than approximately correct. 10.4 WORK SCHEDULE - The work schedule and assignment of storage area(s) shall be discussed and coordinated with the Harbors Division Oahu District Manager and the Construction Engineer and shall be subject to their written approval. The contractor shall turn in a work schedule two (2) weeks prior to actual construction for approval by the Harbors Division Oahu District Manager and the Construction Engineer. The Contractor shall be responsible for maintaining the work and storage areas in neat and orderly condition. Shipping and dock activities by tenants/users will take precedence over the Contractor's activities. Vessels call at various days of the week. An approximate vessel schedule for the project area can be found at hawaii.portcall.com. The exact scheduling of the work and restrictions on the Contractor's activities will be established at the pre-construction meeting. The Contractor shall assume they will not have a consistent 5-day work week schedule due to tenant's activities and daily operations, therefore, weekend work may be required for successful completion of the project. All questions and requests for information (RFI) applicable to the bid documents shall be submitted via HIePRO no later than 14 calendar days before bid opening. Questions received after the deadline will not be addressed. Verbal RFI will not receive a response

Award

Water / Sewer

$545,545.00

Public - State/Provincial

Site Work

8

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
19
Active Projects
3
Bidding Soon
87
All Active Projects
42
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2023

May 18, 2023

img_map_placeholder

Kalaeloa Barbers Point Harbor, Kapolei, HI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.