EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 29, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Norwood, Missouri. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

****(1): Job J7p3433 Route 60 Christian, Lawrence County. Railroad Crossing Improvements From Central Ave. In Marionville to Rose Hill Road, the Total Length of Improvement Being 0.427 Miles. ****(2): Job J7p3434 Route 60 Christian, Lawrence County. Resurface and Ada From Western Avenue in Marionville to County Road 194 West of Republic, the Total Length of Improvement Being 10.71 Miles.**** (3):job J7s3435 Route P Christian County. Resurface and Add Shoulders From Christian/Greene Co Line to Route 14 Near Republic, the Total Length of Improvement Being 4.153 Miles. ****(4): Job J7s3442 Route Bus. 60 Lawrence County. Resurface and Add Shoulders From Route 60 to West of Cowan Drive in Aurora, the Total Length of Improvement Being 4.427 Miles. ****(5): Job J8p3197 Route 60 Greene County. Railroad Crossing Improvements From Route 174 in Republic to County Road 194, the Total Length of Improvement Being 0.288 Miles. ****(6): Job J8p3198 Route 60 Greene County. Resurface From County Road 194 to 0.2 Miles West of Illinois Street in Republic, the Total Length of Improvement Being 0.937 Miles. ****(7): Job J8s3199 Route P Greene County. Resurface From Route 60 to Christian/Greene Co Line Near Republic, the Total Length of Improvement Being 1.162 Miles. Federal Project Number(S): FAF 60-1 (53), FAF 60-1 (54), FAS S604 (5), FAS S604 (16), FAF 60-2 (113), FAF 60-2 (120), FAS S604 (37) Contract I.D. 230421-G01 All questions concerning this project during the bidding process shall be forwarded to the project contact listed below. Darrell Ray Cook, P.E. Transportation Project Manager Missouri Department of Transportation, Southwest District 3025 East Kearney Springfield, MO 65803 Telephone Number: (417) 895-7644 Email: Darrell.Cook@modot.mo.gov All questions concerning the bid document preparation can be directed to the Central Office Design at (573) 751-2876. DBE Goal Percent: 6.00 If submitting a cashier's/certified check, the Bid Bond folder will not turn green. Range: $7.5M to $10M *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Notice to Proceed: June 5, 2023 Completion Date: July 1, 2024 MODOT - G01 - Route 60 Railroad, Resurface and Ada Improvements

Bid Results

Roads / Highways

$8,674,028.00

Public - State/Provincial

Paving, Site Work

460

5

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Backfill, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Aggregate Surfacing, Crushed Stone Surfacing, Paving Specialties, Pavement Markings, Planting, Turf and Grasses, Plugging, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Sanitary Sewerage Utilities, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Inverted Siphons
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
18
Bidding Soon
229
All Active Projects
106
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2023

June 5, 2023

img_map_placeholder

US-60, Norwood, MO

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Route 60 Railroad, Resurface and Ada Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.