BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Philadelphia, Pennsylvania. Completed plans call for site work for a water / sewer project.

As of June 22, 2023, project was awarded to multiple contractors, Danella Companies with $2,803,042.00, Carusone Construction, Inc. with $3,925,626.00, Philip Pio Construction, Inc. with $3,905,289.00, Gessler Construction Co Inc awarded amount not available, JPC Group, Inc. awarded amount not available, Seravalli Inc awarded amount not available, Donato Spaventa & Sons Inc awarded amount not available, John J Dougherty & Son Inc awarded amount not available, Tony DePaul and Son awarded amount not available and D'Angelo Brothers, Inc awarded amount not available. No quotes will be accepted unless a Questionnaire & Financial Statement for Qualified Sellers with all questions fully answered is filed with portal on or before Tuesday, April 11, 2023 CONSTRUCTION of GREEN STORMWATER INFRASTRUCTURE in CRISPIN ST from STANWOOD ST to HESS ST (Est. $1,000,000 to $2,000,000) These Bids require Compliance with Office of Economic Opportunity. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline Apr 17, 2023 This work includes all work necessary to install complete and fully usable green stormwater infrastructure surface and sub-surface features in the project areas as shown and described in the Contract Documents. In general, the work includes sawcutting and removal of existing sidewalk and paving; excavation of trenches and disposal of material; excavation and grading of rain gardens, stormwater bumpouts and swales; installation of check dams and spillways; installation of clean washed stone and geotextile; installation of thermoplastic, ductile iron and RCP drainage pipe and fittings, cleanouts and riser structures; installation of energy dissipaters; installation of observation wells; installation of trench drains and concrete aprons; installation of new stormwater inlets, control structures and laterals; installation and modification of existing inlets, restoration of sidewalks, curbs and streets; placement and grading of specified stormwater and planting soils. B. Construction shall not begin until all erosion and sedimentation control facilities have been installed and approved by the Philadelphia Water Department (PWD). The Contractor shall minimize disturbance within the working area wherever possible, and restrict the limit of disturbance to the extent feasible. C. Landscaping related work is not included in the Contract. Landscaping work will be performed by a separate vendor under contract with PWD. 1.02 SUMMARY OF WORK A. The work of this Contract includes all work necessary to produce complete and fully usable green stormwater infrastructure facilities as shown and described in the Contract Documents. B. The work of this Contract has a designed service life of 100 years. Because of the great expense involved in detecting, locating, and repairing defects, only the best methods and materials, and the most skilled workers, shall be used in the performance of this work. C. The paving work of this Contract has a designed service life of 40 years. All such work shall conform strictly to the requirements of the Philadelphia Streets Department (for work in City Streets) and of the Pennsylvania Department of Transportation (for work in State Highways). D. Past experience indicates that inadequate compacting of backfill in water sewer, and stormwater trenches frequently results in premature failure of paving patches. The Contractor will be required to adhere to the specific placement and compaction requirements as directed elsewhere in these Specifications. E. Past experience indicates that overcompaction of subgrade in green stormwater infiltration trenches results in failure of infiltration systems. The Contractor will be required to adhere to the specific excavation of the subgrade preparation and grading as directed elsewhere in these specifications. F. The Contractor shall be required to maintain a clean, functional, and safe worksite at all times. Measures indicated herein are considered the minimum acceptable requirements to maintain a responsible worksite, although site-specific conditions may mandate additional measures on any

Award

Water / Sewer

$10,633,957.00

Public - City

Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
438
Active Projects
198
Bidding Soon
3,912
All Active Projects
1,802
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

June 26, 2023

img_map_placeholder

Crispin St, Philadelphia, PA


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.