BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and asbestos abatement for a multi-residential development in Little Falls, Minnesota. Completed plans call for site work for a multi-residential development; and for asbestos abatement for a multi-residential development.

The project consists of removing asbestos floor tile and mastic, gypsum wallboard and taping/joint compound, and undercoated sinks. The asbestos is in nine apartments. The kitchen counter/cabinets and upper cabinets are to be removed and disposed of. Bidders may withdraw their bids at any time prior to the time specified for opening. Negligence on the part of the Bidder in preparing their proposal confers no right for the withdrawal of the bid after it has been opened Bids will be considered by LFHRA-Pine Grove Manor Board of Directors on April 17, 2023. A bid tab will be prepared and emailed/mailed to all bidders on April 18, 2023 The Owner reserves the right to waive any irregularities and to reject any or all proposals or award upon such basis as they may deem to be in the Owner best interest. No Bidder may withdraw his proposal within sixty (60) days after the date of the opening thereof. The range hood and microwave wood mount/box in each apartment is the responsibility ofthe abatement contractor to remove. The range hood is to be saved and turned over to the owner. Breaker #20 in the breaker panel turns offthe power to the range hood, abatement contractor is responsible to confirm the power is off before removal. o The light on the living room/kitchen wall, is to be removed by the abatement contractor and disposed. Electrical box switch/plug-in covers are to be saved for the owner The pantry and bedroom closet bamboo curtain is to be removed and disposed by the abatement contractor. o If any ofthe apartments have sheet vinyl linoleum or 12" floor tile in the bathrooms or kitchen areas those items are to be removed in containment as the ACM tile/mastic is underneath the top layer offlooring. o The project now includes removal and disposal of all kitchen cabinets, both the lower and the upper cabinets. o Apartment Unit W-49 is a complete GWB/taping compound removal (walls and ceilings) and any loose insulation above the walls/ceilings except behind the shower in the bathroom. The baseboard heaters remain. This apartment was impacted by smoke damage requiring complete removal of the GWB. o A 9" x 6" hole is to be cut into the gypsum wallboard wall in the bathrooms for the new light. Please refer to the attached drawing

Post-Bid

Multi-Residential

$100,000.00

Public - City

Asbestos Abatement, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
31
Bidding Soon
527
All Active Projects
243
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

May 15, 2023

img_map_placeholder

901 1st Ave SE, Little Falls, MN

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.