BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for a bridge / tunnel in Colorado Springs, Colorado. Completed plans call for the demolition of a bridge / tunnel; and for site work for a bridge / tunnel.

Reference Number 0000314947 STRUCTURE NO. CM00.90W03.06S Contact Alyssa.Lee@coloradosprings.gov with any issues or questions. Do not contact anyone else in the City regarding this solicitation while it is active. The Hunters Lane over Spring Run Creek Bridge Replacement Project proposes to replace two deteriorating corrugated metal pipes with a new 2-cell concrete box culvert. The project includes all work necessary to remove the existing bridge and install the new culvert structure, make channel improvements, and address roadway needs in this Broadmoor neighborhood. Question Deadline 04/11/2023 at 2:00 PM MT Questions are submitted online Yes Estimated Project Magnitude: $450,000 - $550,000 cashier's check or a one-time bid bond underwritten by a company licensed to issue bonds in the State of Colorado and acceptable to the City in an amount equal to at least 5% of the total amount of the Bid payable without condition to the City. Performance Bond, a Labor and Materials Payment Bond, and a Maintenance Bond. Each such bond shall be in the amount of one hundred percent (100%) of the contract price Requests for Information, support and questions shall be directed to: Alyssa Lee Alyssa.Lee@ColoradoSprings.gov The Hunters Lane over Spring Run Creek Bridge Replacement Project proposes to replace two deteriorating corrugated metal pipes with a new 2-cell concrete box culvert. The project includes all work necessary to remove the existing bridge and install the new culvert structure, make channel improvements, and address roadway needs in this Broadmoor neighborhood. The project will provide a larger channel opening for conveyance, as proven when water overtopped the road during a 2013 storm event. The improvements will address a condition issue, improve safety, and allow for continued use of Hunters Lane for public access over the creek crossing. The bridge is located in the southwest part of Colorado Springs, about 1/2 mile east of the Broadmoor Hotel, and adjacent to the Colorado Springs School. The City obtained Highway User Trust Funding (HUTF) for the project and will also utilize PPRTA Emergency Bridge Funds. Improvements by the Contractor include installation of a 2-cell concrete box culvert, wing walls, and guardrail with all removals, earthwork, grading, backfill & compaction, gutter, asphalt paving, channel and drainage improvements, fencing, signing, rock staining and landscape restoration. The project also has removal of obstructions, removal of trees, culvert toe walls / head walls, temp fence, water control, and other items. The work shall include the disposal of all surplus or waste materials and all traffic control/ barricading required. Cold weather protection shall be incidental to unit prices of work items to be performed and not paid for separately. Full restoration of all areas disturbed by the construction activities shall be returned to a condition better than the preconstruction condition. The Contractor shall be required to coordinate with the Colorado Springs School, property owners, and utility companies. The Contractor shall obtain all permits and furnish all transportation, materials, tools, equipment, labor and supplies necessary to complete this improvement project in an efficient and workmanlike manner as shown and specified in these documents. The Contractor shall be responsible for verification and acceptance of the existing site conditions prior to proposing on the project. The Contractor shall notify the engineer 48 hours prior to the commencement of onsite construction activities The Contractor shall be responsible for all work, whether it be performed by himself or by others under a subcontract agreement. All work required to construct the items in this contract shall be performed in a careful and orderly manner with due consideration given to protection of all adjoining property, the public and workmen. Any damage to streets, utilities, public or private property, or the survey benchmarks and construction staking due to the negligence of the Contractor, shall be repaired and restored to its original condition by the Contractor at his expense to the satisfaction of the Engineer. It will be the Contractor's responsibility to ensure that areas not in conflict with new work are not disturbed or damaged during the construction process. Miscellaneous excavation shall not be paid for separately but shall be included in the unit price of the work.

Under Construction

Bridges / Tunnels

$547,037.00

Public - City

Demolition, Site Work

31

10

2

5

Subscribe For Documents

84 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
88
Bidding Soon
1,351
All Active Projects
580
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 20, 2023

May 8, 2023

December 31, 2023

img_map_placeholder

Hunters Point Ln, Colorado Springs, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.