BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 31, 2023 at 8:00 PM

Updated January 29, 2024

Site work for a bridge / tunnel in Atkinson, Illinois. Working plans call for site work for a bridge / tunnel.

Bid Tabulation for project 23-08124-00-DR was rejected due to over Engineer’s Estimate. City/County Henry Removal of Existing 60" Dia. Corrugated Metal Pipe, Construction of a New 60" Dia. Concrete Pipe Culvert. Project Location: TR213 (1500 N) Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Removal of Existing Corrugated Metal Pipe - 23-17134-00-DR

Final Planning

Bridges / Tunnels

$2,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
141
Active Projects
85
Bidding Soon
1,125
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2023

December 1, 2023

Project location map

TR213, Atkinson, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.