BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a municipal facility in Concord, California. Completed plans call for site work for a municipal facility.

The work to be done in general consists of mobilization; traffic control; water pollution control program; crack sealing; type II slurry seal with black rock; digouts; reconstructing concrete sidewalk, curb, gutter, curb ramps, valley gutter and catch basins; pruning and removing tree roots; lowering and adjusting utility covers to finish grade; removal & replacement of traffic striping and pavement markings; installation of roadside signs and tuff curbs; and all other work shown on the Plans and as specified in these Special Provisions. The estimated construction costs for the Base Bid, Additive Bid #1, and Additive Bid #2 are $2,200,000, $200,000, and $150,000 respectively. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City Council has ascertained that State of California prevailing wage rates are applicable for this and all City projects. The Contractor shall possess at least one of the following valid Contractor's licenses at the time the bids are opened: Class "A," General Engineering Contractor or Class "C-12," Earthwork and Paving Contractor FOR QUESTIONS REGARDING THESE PLANS AND SPECIFICATIONS, CONTACT: Deyuanne Lei, P.E. Associate Civil Engineer, City of Concord Community Development Department 1950 Parkside Drive Concord, CA 94520 Email: Deyuanne.Lei@CityofConcord.org T: (925) 671-3049 All questions must be received no later than 4:00 p.m. Thursday, April 6th, 2023 When required by the special provisions or plans, the Contractor shall follow the sequence of operations as set forth therein. All concrete and digout work shall be completed prior to slurry seal application. All work on the following streets shall take place between June 12, 2023, and July 28, 2023: - Concord Boulevard - Almond Avenue - Bacon Street - Galindo Street - Grant Street - Mt. Diablo Street

Bid Results

Municipal

$2,753,759.00

Public - City

Site Work

20

11

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
90
Bidding Soon
1,887
All Active Projects
791
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2023

June 12, 2023

img_map_placeholder

Multiple Locations, Concord, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.