BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a museum in Holland, Michigan. Completed plans call for the renovation of a museum.

https://www.hollandsentinel.com/story/news/history/2023/05/20/city-hall-holland-museum-projects-take-next-step-forward/70230018007/ HOLLAND - After an assessment conducted last year found "significant" structural issues at Holland Museum, Holland City Council has accepted a bid for exploratory work on the historic site, as well as Holland City Hall. More:Holland Museum may need $1 million or more to fix 'significant' structural issues The projects, presented to council Wednesday, May 17, have a budget of about $360,000.Assistant City Manager Matt VanDyken said, over the past 18 months, the city had assessments completed at City Hall, which came back with a couple of recommendations for exterior work, plus some short-term recommendations and a few things that could be done in the future. Council voted to award a base bid of $183,000 for Holland City Hall, plus a bid of $54,000 for additional brick repointing, $33,200 for exterior painting, $20,000 for exterior stair repair and a $35,000 contingency budget. The remaining $36,800 will be used for exploratory work at the museum, which officials estimated could require repairs of $1 million or more.The assessment last year found significant water incursion inside the building due to deterioration of the masonry and masonry joints along the roof and around the facade of the building. Subscribe:Get all your breaking news and unlimited access to our local coverage “Our recommendation to you tonight is to just get this thing done, let’s fix City Hall,” VanDyken said. The work at Holland Museum, meanwhile, will help determine the scope of the work needed. "The museum project is budgeted, but we do want to get some of the stones off the building so we can look at the steel infrastructure behind it to understand if it’s just the exterior or something bigger inside before we really move forward," VanDyken said. ----------------------------------------------------------------------------------------------------------------------------------------------- Reference Number 0000315092 Exterior restoration and exterior maintenance. The City of Holland reserves the right to accept or reject any or all proposals, to waive any irregularities/informalities in the proposals received and to split the proposal if deemed desirable by the City. All questions are to be directed to the Construction Manager. No direct contact with the Owner or Architect is permitted. The deadline for pre-bid questions is by end of day on Tuesday April 4th, 2023. All questions to be forwarded in writing to Jon Brechtelsbauer via email jon.brechtelsbauer@christmanco.com. Each Proposal shall be accompanied by a certified check, cashiers' check, money order, or bid bond made payable to City of Holland in an amount not less than five percent (5%) of the base bid as a bid security. The Bid Security of Bidders under consideration will be returned immediately after award of contracts by the City of Holland. The amount of the guarantee shall be forfeited to the Owner if the successful Bidder fails to enter into a contract and furnish required bonds and insurance within 30 days after award of contracts. Question Acceptance Deadline 04/04/2023 05:00 PM EDT Questions are submitted online No General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % Melissa Wahmhoff 6163551383 m.wahmhoff@cityofholland.com Jon Brechtelsbauer 616-293-4296 jon.brechtelsbauer@christmanco.com Architect/Engineer: Quinn Evans Architects 219 1/2 Main St. Ann Arbor, MI 48104 Construction Manager: The Christman Company 634 Front Avenue NW, Suite 500 Grand Rapids, MI 49504-5355 616-565-4454

Post-Bid

Museum

$400,000.00

Public - City

Renovation

10

7

2

5

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
30
Bidding Soon
476
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

June 5, 2023

img_map_placeholder

Multiple Locations, Holland, MI

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.