Site work for a water / sewer project in Genesee, Pennsylvania. Working plans call for site work for a water / sewer project.

As of August 23, 2023, bids received were rejected. No definite date for the rebid. The work included in this project consists of approximately 1550 LF. of 8' water main and appurtenances along Grover Hollow Road. This work includes installation of a water meter vault, water meter, approximately 12 service sets, 3 gate valves, 2 hydrant assemblies and a connection on each end to existing water main along with other work specified and indicated in the Contract Documents. . Contact the Engineer, Larson Design Group, 1000 Commerce Park Drive, Suite 201, Williamsport, PA 17701, (570) 323-6603 between the hours of 8:00 a.m. and 5:00 p.m., Monday through Friday. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. A certified check or bank draft payable to the order of Genesee Township Water Authority, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to ten percent (10%) of the total of the Bid, shall be submitted with each bid. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. The GTWA is utilizing federal funds for this project, and Potter County has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138, and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the CONTRACTOR shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. Potter County, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. DavisBacon and Related Acts apply to this Project. The ENGINEER shall decide questions which may arise as to the quality and acceptability of materials furnished, Work performed, rate of progress of Work, interpretation of Plans and Specifications and all questions as to the acceptable fulfillment of the Contract Agreement on the part of the CONTRACTOR. The duties and responsibilities of the ENGINEER as setforthhereinshallnotbeextendedexceptthrough written consent of the ENGINEER and the OWNER Bids may be held by the GTWA for up to 60 days from the date of opening for the purpose of reviewing the bids and investigating the qualifications of bidders prior to awarding the contract. The GTWA reserves the right to reject any or all bids, to waive any irregularities, or to negotiate contract amounts. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the CONTRACTOR must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. Should you have any questions or concerns, please contact Jason Ryndock, Ecological Information Specialist, by phone (717-705-2822) or via email (c-jryndock@pa.gov).

Final Planning

Water / Sewer

$593,718.00

Public - City

Site Work

27

21

3

Subscribe For Documents

48 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
75
Bidding Soon
1,101
All Active Projects
456
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 16, 2023

March 15, 2024

August 17, 2023

img_map_placeholder

Grover Hollow Rd, Genesee, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.