BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lansdale, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

2023 Liquid Fuels Mill & Overlay Project The project will include pavement resurfacing, including asphalt mill and overlay, pavement base repairs as necessary, and replacement of existing pavement markings with new pavement markings. Upon award of a contract, the Successful Bidder shall provide a Performance Bond and a Labor and Materials Payment Bond, each in the amount of 100% of the awarded contract value. Upon completion of the contract, the Successful Bidder shall provide a 2-year Maintenance Bond in the amount of 100% of the final contract value. Attention is called to the fact that not less than the minimum salaries and wages set forth in the Contract Documents must be paid on this project, and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex or national origin. Bidders are required to comply with the Pennsylvania Prevailing Wage Act of 1961, P.L. 987, No. 442, where the estimated cost of the total project is in excess of one-hundred thousand dollars ($100,000). The Borough of Lansdale reserves the right to reject any or all Bids or to waive any informalities or irregularities in the bidding when, in the opinion of the Borough, such rejections or waivers shall be to its interest or advantage. Prior to awarding the contract, bids may be held by the Borough for a period not to exceed sixty (60) days from the date of bid openings for the purpose of reviewing the Bids and investigating the qualifications of bidders. This project is funded by Pennsylvania Department of Transportation (PennDOT) Municipal Liquid Fuels Program. All material must meet current PennDOT Specifications Requests for clarification are due Friday, April 14, 2023 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. . West Eighth Street, from Squirrel Lane to South Cannon Avenue; . Church Road, from Municipal Boundary to Main Street (S.R. 0063); . North Valley Forge Road, from East Main Street (S.R. 0063) to West Eighth Street; . Walnut Street, from East Main Street (S.R. 0063) to West Seventh Street. . Pavement Resurfacing and Pavement Markings . Contractor shall inventory all existing pavement striping and symbols. At intersections with through and turning lanes, contractor shall provide temporary lane striping and stop bars on milled surface before removing temporary traffic controls. . Perform 1.5" depth profile milling of the existing asphalt pavement surface. Milling limits will be marked out by the Borough/Engineer prior to milling. . Contractor shall provide a fully loaded triaxle dump truck and proof roll the milled surface with the Engineer to mark areas for base repair. . Perform asphalt base repairs, if and where directed by the Engineer. Construction of Superpave Asphalt Scratch Course, as directed by the Engineer. . Construction of 1.5" Superpave Asphalt Wearing Course. .Contractor shall replace all existing permanent pavement markings on resurfaced roadways in accordance with PennDOT Publication approved Traffic Signal Permit Plans, and the inventory of existing pavement markings.

Bid Results

Roads / Highways

$821,197.00

Public - City

Paving, Site Work

37

21

5

7

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
428
Active Projects
175
Bidding Soon
3,943
All Active Projects
1,803
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2023

May 22, 2023

img_map_placeholder

Multiple Locations, Lansdale, PA

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.