BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Prairie Grove, Arkansas. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

https://www.nwaonline.com/news/2023/apr/29/prairie-grove-oks-28-million-bid-for-viney-grove/ PRAIRIE GROVE -- The low bid on a major city project to extend Viney Grove Road from the middle school to Buchanan Street was about $300,000 under the engineers cost estimate. The Prairie Grove City Council accepted a bid of almost $2.8 million from Sweetser Construction at its April 17 meeting. This is Phase 2 of the Viney Grove Road project. Phase 1 was reconfiguring the intersection of Bush Street and Viney Grove Road for a construction cost of $1.25 million. The city is paying for Phase 2 with money from its street improvement bonds and the street fund. The Viney Grove Road extension will curve southwest from the middle school, cross a creek with a culvert and then connect to West Buchanan Street, lining up with Blunt Street on the other side of Buchanan. The citys master street plan shows that eventually Blunt Street will connect to the bypass. As part of this project, the council also approved a contract with Olsson to provide engineering services overseeing the construction of the Viney Grove extension, for a price not to exceed $243,742. This contract shows that construction will start in early June with an anticipated completion date of March 31, 2024. ______________________________________________________________________ A. This Section summarizes the Work and supplements the information detail in the complete Contract Documents. B. Owner: The City of Prairie Grove, Arkansas, 975 E Douglas Street, Prairie Grove, Arkansas,72753 is contracting for Work described in the Contract Documents. 1. Contract Identification: VINEY GROVE - PHASE 2. 2. Location: Prairie Grove, Arkansas. C. Engineer: The Contract Documents were prepared by Olsson, 302 East Millsap Road, Fayetteville, AR 72703. Project Category Code: Roadway Pavement Markings, Pavement - Marking, Drainage, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Street/Road Intersection Improvements, Drainage, Dredging, Ditches and Canals, Sitework/Excavating and Grading, Signage, Paving (Asphalt or Concrete) Description: The Work under this Contract includes, but is not limited to, The Viney Grove Rd - Phase 2 improvements consist of the extension of Viney Grove Road from the south end of the intersection improvement at Bush Street (part of the Phase 1 project constructed by others), southerly for approximately 2,400 linear feet to the intersection with Buchanan Street (formerly US 62B) to add turn lanes and approximately 500 linear feet along Blunt Avenue. More specifically the project includes updating existing ditched roadway to include a new 3-lane roadway with grading, asphalt paving, grading, concrete curb & gutter, sidewalks, drainage inlets, storm sewers, berm construction, culvert installation, pavement markings and signage, and other associated work as indicated on the drawings and within the specifications.

Award

Sidewalks / Parking Lot

$2,800,000.00

Public - City

Paving, Site Work

67

23

4

4

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
69
Bidding Soon
834
All Active Projects
385
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 6, 2023

May 8, 2023

April 2, 2024

img_map_placeholder

W Bush St, Prairie Grove, AR


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.