BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a water / sewer project in Mountain Brk, Alabama. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work of labor for the Proposed Winfield Water System Critical Needs Infrastructure Improvements Project. The principal items of work are detailed herein below. 1. (Interior Tank Coating) 250,000 Gallon Midway Elevated Tank 2. (Exterior Tank Coating) 250,000 Gallon New Well Elevated Tank 3. (Required Miscellaneous Tank Repair) Both Tanks The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving Bids. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 90 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF THE CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. The contractor shall not that funds for this project are provided through DWSRF (Drinking Water State Revolving Funds). All Applicable Federal Guidelines must be met. There will not be a Pre-Bid meeting.

Bid Results

Water / Sewer

$450,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
36
Bidding Soon
542
All Active Projects
240
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2023

May 12, 2023

img_map_placeholder

Multiple Locations, Mountain Brk, AL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.