BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Grand Isle, Louisiana. Completed plans call for site work for a water / sewer project.

This requirement is for the Contractor to rpair fuel tank and surface preservation of 4000 - gallon diesel above ground storage tank (AST). This requirement will have (1) definite work item and (8) option work items in accordance with Performance Work Statements (PWS) provided. Please note this requirement will have specific TESTING Points throughout the requirement All testing will be conducted with an appointed USCG personnel present. ALL work shall be done in accordance with AST manufacturing instructions, 29CFR 1910.106.applicable EPA regulations, NFPA 30 and NFPA 30A. PROVIDE AN ITEMIZED PRICE FOR DEFINITE WORK ITEM AND EACH OPTION ITEMS WHEN SUBMITTING QUOTE. A site visit is encouraged. Vendors are to be registered and current in SAMS. GOV with UEI. Federal Acquistion Regulations Clauses and DBA Wage Rates LA20230052 are included and applicable. General: United States Coast Guard Station Grand Isle is accepting proposals for qualified individuals or firms to repair, test, and preserve the exterior surface of its 4,000-gallon steel above ground diesel storage tank and fuel piping. Prior to submitting a quote, it is mandatory to examine the Performance Work Statement and it is highly recommended to visit the facility to take field measurements, evaluations, etc., and become familiar with existing conditions under which the work will be performed. After the award of contract, a pre-conference will be held prior to starting the work at Coast Guard Station Grand Isle. Location: United States Coast Guard Station Grand Isle. 453 Admiral Craik Dr, Grand Isle, LA 70358 I. Continuity of Facilities Operation: Schedule work to minimize interference with the facility's normal operations. Normal operating hours are from 7:30am to 4:00pm Monday thru Friday except federal holidays. Any work during other hours unless otherwise instructed or permitted shall be scheduled and approved with the Contracting Officers Representative. II. Notification of Start and Completion of Work: The Contractor shall notify Coast Guard one week prior to start of work. III. Coast Guard Contracting Officers Representative: The Contractor shall contact the COR to coordinate all construction efforts onboard Coast Guard Facilities. MKC David E. Spencer David.E.Spencer@uscg.mil 713-410-1078 IV: Recycling and Disposal of Refuse: Minor refuse, excess or waste materials resulting from construction operations may be disposed of in base dumpsters. All disposals shall be done in accordance with federal, state, and local laws and regulations. All bulk waste shall be disposed of in contractor provided dumpsters. FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) [Applicable if marked; required for Fixed Price Contracts] The Contractor shall be required to: (a) Commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed. (b) Prosecute the work diligently, and (c) Complete the entire work ready for use not later than 30 calendar days after the date the contractor receives the notice to proceed (if industry standards allow). The time stated for completion shall include final cleanup of the premises.

Post-Bid

Water / Sewer

$100,000.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
50
Bidding Soon
559
All Active Projects
266
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 27, 2023

May 29, 2023

June 25, 2023

img_map_placeholder

453 Admiral Craik Dr, Grand Isle, LA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.