Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Alpena, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.
OWNER reserves the right to remove salvage items for use by OWNER. These items shall be identified in the Contract Documents or shall be removed by OWNER prior to the issuance of the Notice to Proceed NIGP CODES: 90924, 90976, 91200, 91223, 91244, 91375, 91382 CONTRACTOR may recycle demolition debris at a licensed or permitted recycling center, however, all other debris must be disposed of at a licensed or permitted disposal facility The prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. The DTMB prevailing wage is satisfied when wages plus fringe benefits are equal to or greater than the required rate. This Section includes furnishing, installing, maintaining, and removing at project completion, Soil Erosion and Sedimentation Control devices. Devices include silt fence, straw bales, turbidity barriers, temporary gravel construction entrance/exits, inlet filters, ditch sediment traps, etc. Work includes the removal and disposal of the building materials and debris including the removal and disposal of miscellaneous site debris, including but not limited to building area debris, woods, piping materials, bricks, roof materials, metal equipment and all other non-specified material and debris found at the site. Work includes the removal and disposal of the building debris and concrete materials generated by the demolition of the structures listed above. Removal and disposal of concrete, rebar, and steel is incidental to the project. It is recommended that steel be recycled. CONTRACTOR may recycle concrete and asphalt to reduce cost. Question Deadline 04/12/2023 at 12:00 PM ET
Award
Sidewalks / Parking Lot
$223,313.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 19, 2023
May 19, 2023
160 E Fletcher St, Alpena, MI
Related To This Project
Alpena, MI
Bid Date: Apr 24 2023
Alpena, MI
Bid Date: May 01 2023
Alpena, MI
Bid Date: May 01 2023
Alpena, MI
Bid Date: Jul 31 2023
Alpena, MI
--
Alpena, MI
Bid Date: Jun 14 2023
Alpena, MI
Bid Date: Jul 10 2023
Alpena, MI
Bid Date: Jul 07 2023
Alpena, MI
Bid Date: Apr 04 2023
Alpena, MI
Bid Date: Mar 27 2023
Alpena, MI
Bid Date: Feb 23 2021
Alpena, MI
Bid Date: Mar 15 2023
Alpena, MI
Bid Date: Feb 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.