BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Alpena, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and sidewalk / parking lot.

OWNER reserves the right to remove salvage items for use by OWNER. These items shall be identified in the Contract Documents or shall be removed by OWNER prior to the issuance of the Notice to Proceed NIGP CODES: 90924, 90976, 91200, 91223, 91244, 91375, 91382 CONTRACTOR may recycle demolition debris at a licensed or permitted recycling center, however, all other debris must be disposed of at a licensed or permitted disposal facility The prevailing rate schedule provides an hourly rate which includes wage and fringe benefit totals for designated construction mechanic classifications. The overtime rates also include wage and fringe benefit totals. Please pay special attention to the overtime and premium pay requirements. The DTMB prevailing wage is satisfied when wages plus fringe benefits are equal to or greater than the required rate. This Section includes furnishing, installing, maintaining, and removing at project completion, Soil Erosion and Sedimentation Control devices. Devices include silt fence, straw bales, turbidity barriers, temporary gravel construction entrance/exits, inlet filters, ditch sediment traps, etc. Work includes the removal and disposal of the building materials and debris including the removal and disposal of miscellaneous site debris, including but not limited to building area debris, woods, piping materials, bricks, roof materials, metal equipment and all other non-specified material and debris found at the site. Work includes the removal and disposal of the building debris and concrete materials generated by the demolition of the structures listed above. Removal and disposal of concrete, rebar, and steel is incidental to the project. It is recommended that steel be recycled. CONTRACTOR may recycle concrete and asphalt to reduce cost. Question Deadline 04/12/2023 at 12:00 PM ET

Award

Sidewalks / Parking Lot

$223,313.00

Public - State/Provincial

Paving, Site Work

11

14

2

4

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
4
Bidding Soon
98
All Active Projects
35
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 19, 2023

May 19, 2023

img_map_placeholder

160 E Fletcher St, Alpena, MI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.