BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Salt Lake City, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Relocation of utility and addition of utilities to the station platforms Construction of station platforms including all the utilities and the canopies structures. This includes snow melts systems for center stations and all canopy roofs as well as the necessary accessories for the stations. An extension of the North Jordan Canal. Construction of an exclusive busway along 4700 South which includes conforming to the Geotech report for the soils in the median Construct post and panel walls throughout the project Traffic control during construction Upgrading signals to accommodate including adding a TSP system. Signing and striping ATMS, Lighting and communications with connections to the UTA hubs Installation of UTA provided overhead chargers. Storm drain installation Re-landscaping disturbed areas Improvements to the West Valley Station Improvements to the Murray Station including coordination with Murray City for work within the environmentally sensitive Smelter Site Overlay District (SSOD) Construct a new bus stop hub at Salt Lake Community College (SLCC). Removal of the old hub at SLCC Following all environmental, quality and safety requirements Constructing the project with the proper Buy America requirements Assisting UTA with Public Relations as needed to provide property owners and the public understanding of project schedule and impacts to their properties/accesses. Contractor shall pay its employees and also ensure its sub-tier contractors at every level pay their eligible employees the prevailing wage rate as established by the Utah State Labor Commission. Unless otherwise excused by the terms of the Contract Documents, Contractors failure to timely perform the Work in accordance with the completion milestones shall result in the assessment of liquidated damages (if, and to the extent, set forth in the Agreement) and (where no liquidated damages are provided under the Agreement or where the maximum liquidated damages available under the Agreement have been incurred) an event of default. Project Start Date Estimated February 15, 2024 A Performance Bond equal to 100% of the Contract price provided prior to formal contract execution; and A Payment Bond equal to 100% of the Contract price provided prior to formal contract execution. Construct the Mid-Valley BRT project in a timely, safe, and efficient manner. This project is anticipated to be completed and activated for revenue service in 2026. Question Deadline 10/17/2023 at 2:00 PM Questions and Requests for changes to the RFP must be submitted via the SciQuest Q&A page before the end of the Question-and-Answer period UTA reserves the right to make changes to the RFP, by issuing a written addendum to the RFP which will be posted to SciQuest Construct Bus Rapid Transit infrastructure including stations, roadway, electrical, and communication systems. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com.

Post-Bid

Roads / Highways

$54,700,000.00

Public - State/Provincial

Paving, Site Work

739

67

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
67
Active Projects
29
Bidding Soon
551
All Active Projects
250
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 21, 2023

February 15, 2024

img_map_placeholder

Multiple Locations, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.