BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Elton, Louisiana. Completed plans call for site work for a water / sewer project.

Project Estimate: $550k to $625k Each bid must be accompanied by bid security made payable to Owner in an amount of 5 percent of bidder maximum bid price and in the form of a certified check, cashier's check or a bid bond. The successful bidder will be required to obtain a Performance Bond and a Payment Bond each in the amount of 100% of the contract amount. All bonds shall be executed by such sureties as are named in U.S. Department of the Treasury Circular 570. A bond signed by an agent or attorney-in-fact must be accompanied by a certified copy of that individual's authority to bind the surety. Bidders may not withdraw their bid within forty-five (45) days after the actual date of opening thereof. The Owner reserves the right to reject any and all bids forjust cause in accordance with Louisiana R.S. 38:2214B The Contractor shall begin mobilization and procurement of materials within ten (10) working days of the receipt of the Notice to Proceed. Minority owned firms, small businesses, and/or Section 3 businesses are encouraged to participate. Any person with disabilities requiring special accommodations must contact the Owner no later than seven (7) days prior to bid opening. The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Heavy Construction or, Municipal and Public Works Construction or, Highway, Street and Bridge Construction Base Bid: Demolition ofexiting perimeter fence and gate and Construction ofnew concrete flood barrier, new chainlink fence, new passive barrier, new water stops, new lift station, and new electrical service to lift station and passive, self-rising flood gate. Deductive No. 1: Flood barrier at entrance gate changes from passive, self-rising flood gate system to active system that is material only.

Award

Water / Sewer

$1,281,800.00

Public - Federal

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

23

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
40
Bidding Soon
571
All Active Projects
300
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 5, 2023

February 5, 2024

October 2, 2024

img_map_placeholder

Multiple Locations, Elton, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.