EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 27, 2023 at 8:00 PM

Updated October 1, 2024

Site work and paving for a civil project in Taylor, Pennsylvania. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This project is for the construction of the Stauffer Road Construction/Paving Project Phase 3, Taylor Borough, Lackawanna County in the Commonwealth of Pennsylvania. The purpose of the project is to provide safe and efficient travel through the Stauffer Industrial Park. Upgrading the pavement for this facility will provide safer access for emergency services to access the facilities within the industrial park. In addition, this project seeks to encourage further economic development, provide opportunity for new jobs and retain existing employers. Phase 3 of the project includes road improvements within the Stauffer Industrial Park, on Stauffer Road and Kane Lane, in Taylor Borough, Lackawanna County. This project includes roadway rehabilitation consisting of full depth reconstruction, base repair, milling and overlay, shoulder restoration, minor widening, and drainage repairs. Traffic will be maintained through the site during construction with short-term flagging and long-term stationary operations. Local access to commercial driveways will be maintained during construction. Approximate project limits as follows: Stauffer Connector (Sta 200+00.00 to 214+53.00) - Beginning at the intersection of Stauffer Road and ending 30 feet south of the railroad tracks. Stauffer Road (Sta 127+10.00 to 153+09.00) - Beginning 200 feet south of Kane Lane to 1000 feet north of intersection with Stauffer Connector terminating near the security gate. Kane Lane (Sta 300+14.61 to 321+64.48) - Beginning at Stauffer Road to the southern cul-de-sac. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-Bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Miscellaneous 408 Version: 2020-6 PennDOT - Stauffer Road Construction/Paving Project Phase 3 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$1,876,305.00

Public - State/Provincial

Paving, Site Work

139

7

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Special Procedures, Alteration Project Procedures, Execution and Closeout Requirements, Execution
Division 08 - Openings

Division 08 - Openings

Hardware
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Embankments, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
184
Active Projects
122
Bidding Soon
1,501
All Active Projects
673
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

July 24, 2023

img_map_placeholder

Stauffer Road, Taylor, PA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Stauffer Road Construction/Paving Project Phase 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.