BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Barrington, New Hampshire. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Town of Barrington is requesting competitive proposals for its 2023 crack sealing projects that include preparation of the cracks, installation of crack sealant, and roadway cleanup. The scope of work includes eight roads within the Town with an estimated total length of 42,450 linear feet of roadway to be crack sealed. Depending on bid pricing, bid quantities may be adjusted, so the project total is within the Town's budget. All crack sealing shall be completed by July 1, 2023. For more information, please call Marc Moreau (603) 948-5203. Scope of work can be shown to each contractor by the Road Agent, if requested. Each contractor is responsible for taking their own measurements, determining the amount of preparation work, and volume of crack sealant required for the roads included in the Scope of Work for a single square yard unit price that applies to the entire project. Upon receipt of written notice of acceptance of their proposal, the successful firm shall within ten calendar days to the Town and under (RSA 447:16) deliver to the Town an executed Performance Bond as security in the amount of 100% of the contract price, as security for the faithful performance of his Contract and the payment of all persons performing labor or furnishing materials in connection therewith, prepared in the form of a Performance & Payment Bond attached hereto, and having a surety thereon such surety company or companies are as approved by the Town, and as are authorized to transact business in the State of New Hampshire. Such bond shall acknowledge and permit and occupancy of the project or any portion thereof prior to formal acceptance by the Town. The Town reserves the right to accept, reject, modify or negotiate any and/or all proposals or any portion thereof in the best interest of the Town of Barrington and to waive informalities. The Town also reserves the right to adjust the tonnage being laid even after award of the contract and changes to the total of roads listed. Winning firm will be required to submit performance and payment bonds and insurance certificates.

Award

Roads / Highways

$62,836.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
107
Bidding Soon
1,982
All Active Projects
809
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2023

May 26, 2023

img_map_placeholder

Multiple Locations, Barrington, NH

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.