BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 7, 2025 at 8:00 PM

Updated August 8, 2025

Site work and new construction of a mixed-use development in Purcellville, Virginia. Working plans call for the construction of a 83,000-square-foot fitness / recreation center; for site work for a fitness / recreation center; 40,000-square-foot library; playground / park / athletic field; and swimming pool.

As of August 8, 2025, this project is still in the design phase per the owner. Information regarding a general contractor has not been disclosed. Although a firm timeline for construction has not been finalized, it is not expected to begin prior to Summer 2026. This project provides funding for the design and construction of a new 83,000 sq ft recreation center and park on a 142.71-acre site at 36716 Main Street just outside the town limits of Purcellville, Virginia. - The recreation center will include meeting/classrooms, administrative office space, gymnasium, kitchen, fitness center, multi-purpose rooms, and a running track. The facility will also include an aquatics center with a competition pool, leisure pool, spa, spectator seating areas, two wet classrooms, splash play area, and associated locker rooms. Additional features on the grounds may include sports courts, rock-climbing wall, outdoor fitness area, and a diving pool. - The park will include up to ten athletic fields - four diamond fields and six rectangular fields. Supporting amenities will include athletic field lighting, fencing, public utilities, parking, access from a public road, groundwater wells irrigation, and landscaping. Additionally, the park will include public restrooms, concessions facilities, staff offices, meeting rooms, storage, scorekeeper and umpire areas, a maintenance facility, picnic pavilions, and bleachers. - The project will also provide a master plan identifying a potential future 40,000 square-foot Library facility. The estimated construction cost for the Western Loudoun Recreation Complex is $83.8 million.

Final Planning

Swimming Pools

$122,687,000.00

Public - County

LEED Certification, New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
460
Active Projects
164
Bidding Soon
3,018
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 18, 2023

June 30, 2026

Project location map

36716 Main St, Purcellville, VA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.