BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Manitou Springs, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Deadline to present questions is April 7th, 2023 at 4:00 PM o Questions are to be addressed to the contact person via e-mail only o Bids shall be submitted to the contact person electronically o There will not be a public bid opening The most-current prevailing wage determination Additional forms for reference regarding Davis-Bacon Wages: o HUD Form 4010 o HUD Form 92554M The bid shall have an Anticipated Scope of Services that includes the following: 1. The Contractor will provide project costs for crews and equipment, anticipated mobilization time, and anticipated project completion time. 2. The Contractor is responsible to provide all materials and equipment necessary for fabrication, construction, and/or installation of this project. 3. All waste shall be disposed of by the Contractor. 4. The Contractor is responsible for damages, inside or outside the project area. 5. The Contractor is responsible for their own confined space, roadway, and trenching safety procedures. 6. If the project requires street closure - partial or otherwise, the Contractor shall provide all necessary traffic control. All traffic control personnel must at a minimum carry a current CDOT Flagger Certification. A Traffic Control Plan must be submitted to and approved by City staff at the pre-construction meeting. The pre-construction is to be scheduled at time of accepting the contract. 7. Below is the General Scope of Services for this project: GENERAL SCOPE OF SERVICES This project will complete sidewalk, ADA and drainage improvements along El Monte Place, Manitou Avenue and Duclo. Design services will be required to ensure slopes provide positive drainage. The Design Services (LS) item is to compensate the contractor for the time, energy and resources needed to verify grades and work product. Asphalt patching will be an optional item, if it is needed, to facilitate positive drainage with the new curb and gutter. The work on El Monte and Duclo cannot occur until after school is out for summer. Once school is out, the road can be fully closed to facilitate the work for El Monte and partial closure for Duclo, but the traffic control plans must be approved by the City. It is expected that shoulder closures will be needed for the rest of the work. The contractor is responsible to get the traffic control plans approved by the City. See attached RFP for photos, details, and instructions on bidding process Contact: Dole Grebenik, City Engineer, dgrebenik@manitouspringsco.gov Alicia Stoke, Senior Administrative Assistant, astoke@manitouspringsco.gov

Post-Bid

Sidewalks / Parking Lot

$750,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
79
Bidding Soon
1,250
All Active Projects
540
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 14, 2023

May 15, 2023

img_map_placeholder

El Monte Pl, Manitou Springs, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.