Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Hollywood, Florida. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Pilot program to install odor and air release control equipment at MH Structures at McKinley Street and Tyler Street. Due to the manhole covers bobbling, due to the internal pressures, and odor complaints from the neighborhood. The City of Hollywood requested pilot a design and analysis to provide a solution to the residence. Question Submission Deadline:April 5, 2023, 5:00pm There will not be a pre-bid conference or site visit for this solicitation. For information concerning procedures for responding to this solicitation, contact the Point of Contact within the Office of Procurement Services, Jean Joinville, Senior Purchasing Agent atjjoinville@hollywoodfl.org or by phone at (954) 921-3290, or Steve Stewart, Chief Procurement Officer (CPO) at sstewart@hollywoodfl.org or by phone at 954-921-3628. Such contact is to be for clarification purposes only. All questions must be submitted in writing via the Portal by NO VALUE, by 5:00 pm, in order to receive a timely response. The City also reserves the right to accept or reject any or all bids, part of bids, and to waive minor irregularities or variations to specifications contained in bids, and minor irregularities in the bidding process. The City also reserves the right to award the contract on a split order basis, lump sum basis, individual item basis, or such combination as shall best serve the interest of the City. Work under this Contract consists of civil, sitework, mechanical, structural, and all related work necessary for the installation of a vent pipe at each of Manhole Nos. 6 and 10 along McKinley Street and the removal and replacement of Four (4) manhole frames and covers and vent pipe installation at the Conflict Box at Tyler Street and 13th Ave. Work includes excavation, coring of manholes, installation of vent pipes, reinforced concrete pedestals, stand pipes, associated valves, sidewalk removal and replacement, backfill, asphalt and driveway repairs and other work as required in the Contract Documents. The Contractor agrees to cooperate and work with [ALL ADDITIONAL DEPARTMENTS THAT MAY REQUIRE COORDINATION]. The work to be performed includes site, civil, sitework, mechanical, structural, and all related work associated with the following: McKinley Street Ventilation Manhole Nos. 6 and 10: This work consists of surveying, saw cutting asphalt and concrete, excavation, core drilling, forming and pouring concrete, vent pipe and valve installation, vent pole installation, and backfilling and restoration of affected roadway, driveway, sidewalk and grassy areas. In addition, this work includes all construction sequencing requirements. Tyler Street Conflict Box: The work consists of removal and replacing existing manhole rings and covers, installation of interconnecting vent pipes inside conflict box, installation of conflict box vent, and restoration of road and roundabout, including brick, curb, and vegetation. B. It is the intent of the CITY to obtain a complete and working installation under this contract and any items of labor, materials or equipment, which may reasonably be assumed as necessary to accomplish this end, should be supplied whether or not specifically shown on the plans or described herein. Maintenance of existing operations is mandated throughout the construction period The project is approximately located at 2338 McKinley Street, 1855 McKinley Street, and 13th Avenue and Tyler Street in Hollywood, Florida. Work under this Contract consists of civil, sitework, mechanical, structural, and all related work necessary for the installation of a vent pipe at each of Manhole Nos. 6 and 10 along McKinley Street and the removal and replacement of Four (4) manhole frames and covers and vent pipe installation at the Conflict Box at Tyler Street and 13th Ave. Work includes excavation, coring of manholes, installation of vent pipes, reinforced concrete pedestals, stand pipes, associated valves, sidewalk removal and replacement, backfill, asphalt and driveway repairs and other work as required in the Contract Documents.
Award
Water / Sewer
$200,495.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 26, 2023
May 26, 2023
Multiple Locations, Hollywood, FL
Related To This Project
Hollywood, FL
--
Hollywood, FL
Bid Date: Apr 27 2023
Hollywood, FL
--
Hollywood, FL
Bid Date: Apr 27 2023
Hollywood, FL
--
Hollywood, FL
--
Hollywood, FL
--
Hollywood, FL
--
Hollywood, FL
Bid Date: Jun 16 2020
Hollywood, FL
Bid Date: Jun 21 2023
Hollywood, FL
Bid Date: Apr 26 2023
Hollywood, FL
--
Hollywood, FL
Bid Date: May 11 2023
Hollywood, FL
--
Hollywood, FL
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.