Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 24, 2023 at 8:00 PM
Updated October 9, 2025
Renovation of a water / sewer project in Brighton, Colorado. Completed plans call for the renovation of a water / sewer project.
Reference Number 0000320296 Metro Water Recovery (Metro) intends to engage a Construction Manager At-Risk (CMAR) to provide preconstruction and construction services for Post Aerobic Digestion Improvements (Project). The Project will replace mechanical elements of the existing post aerobic digestion (PAD) system. This work will include replacement of the existing chemical feed system which is used to add alkalinity and sequester phosphorus. The Project will also improve PAD aeration performance and blower system stability by providing the ability to isolate one or more existing blowers dedicated for PAD, and by matching the aeration system capacity to the PAD tank capacity. Lastly, the Project will provide flexibility for cooling the PAD using the existing digester heat exchangers. Question Acceptance Deadline 06/07/2023 02:00 PM EDT Questions are submitted online. No Contact Information Aidan Travers 3032863359 atravers@metrowaterrecovery.com
Post-Bid
Water / Sewer
$750,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 22, 2023
July 24, 2023
51 Baseline Rd, Brighton, CO
Related To This Project
Brighton, CO
Bid Date: Sep 12 2019
Brighton, CO
Bid Date: Apr 04 2023
Brighton, CO
Bid Date: May 17 2023
Brighton, CO
Bid Date: Jul 06 2021
Brighton, CO
Bid Date: Jun 05 2023
Brighton, CO
--
Brighton, CO
Bid Date: Apr 14 2023
Brighton, CO
Bid Date: Apr 03 2023
Brighton, CO
Bid Date: Jun 06 2023
Brighton, CO
Bid Date: Mar 30 2023
Brighton, CO
Bid Date: Mar 30 2023
Brighton, CO
Bid Date: Mar 13 2023
Brighton, CO
Bid Date: Aug 03 2021
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
