BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 19, 2023 at 8:00 PM

Updated January 26, 2024

Renovation of an educational facility in Kingston, Ontario. Completed plans call for the renovation of a educational facility.

The Scope of Work pertains to replacement of approximately 2,600m2 (28,000 sq ft) of roof at Leonard Hall. The building is a concrete and steel structure with a five-story residence and a one and two story kitchen and dining area. The roof generally consists of a protected membrane system with gravel and paver ballast. The intent of the project is to replace the existing roof on the Leonard Hall, including, but not limited to, ballast, insulation, membrane, flashings, counter-flashings, drains and vents. The new roof will be an inverted, built-up, roof membrane system. Site visit rescheduled to Tuesday, April 11, 2023 @ 11am Question Deadline 04/18/2023 at 4:00 PM ET

Award

Educational

$300,000.00

Public - State/Provincial

Renovation

18

15

4

10

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
89
Bidding Soon
922
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2023

May 3, 2023

Project location map

128 Queen's Cres, Kingston, ON

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.