EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 4, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Benson, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Types of work: Reclamation, Milling, Bituminous Paving, Aggregate Surfacing & ADA Improvements Length/Location: On CSAH 6 - from TH 7/59 to Swift CSAH 17 (11.803 Miles) Combined Major Items: Aggregate Surfacing Class 1 Mod - 11,302 Ton Mill Bituminous Surface (1.5") - 168,834 Sq Yds Type SP 12.5 Bituminous Wear Course (2,B) - 32,851 Ton. Reclamation, Milling, Bituminous Paving, Aggregate Surfacing & ADA Improvements Construction Start Date:07/10/2023 Construction End Date:09/01/2023 Completion: 40 Working Days

Award

Roads / Highways

$2,906,201.00

Public - County

Paving, Site Work

27

7

3

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Concrete Finishing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 09 - Finishes

Division 09 - Finishes

Tiling, Painting and Coating
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
14
Active Projects
8
Bidding Soon
209
All Active Projects
104
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2023

July 10, 2023

img_map_placeholder

County Rd 6, Benson, MN

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Reclamation, Milling, Bituminous Paving, Aggregate Surfacing & ADA Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.