Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fire / police facility in Pomona, New York. Completed plans call for the renovation of a fire / police facility.
Reference Number: 0000315294 Description of Work: The project provides for the building construction of the Firematic Training Site - Fire Operations Building, at the County of Rockland Fire Training Center. This training facility will be used to simulate the heat, smoke, and darkness conditions encountered in actual firefighting operations. The building will be equipped with a heat monitoring alert system as well as a smoke evacuation system. The County of Rockland has purchased this as a complete pre-engineered building package from Fire Facilities. All building components and materials are currently being stored in weatherproof shipping containers at the Dr. Robert L Yeager Health Center (approximately 1.5 miles from the project site). The foundation and related site work for this structure will be completed prior to the commencement of this project. The foundation and site plan was coordinated and engineered to meet the exact dimensions and load requirements of this building structure. General Construction will be required to transport all building materials from storage to the project site, provide required protection of the materials once on site, and provide all labor, equipment, and supervision required to construct the building as per the manufacturer's Building Erection Manual. The contractor will not be permitted to transport the building components in the shipping containers they are currently being stored in. Description of Work: The project provides for the building construction of the Firematic Training Site - Fire Operations Building, at the County of Rockland Fire Training Center. This training facility will be used to simulate the heat, smoke, and darkness conditions encountered in actual firefighting operations. The building will be equipped with a heat monitoring alert system as well as a smoke evacuation system. The County of Rockland has purchased this as a complete pre-engineered building package from Fire Facilities. All building components and materials are currently being stored in weatherproof shipping containers at the Dr. Robert L Yeager Health Center (approximately 1.5 miles from the project site). The foundation and related site work for this structure will be completed prior to the commencement of this project. The foundation and site plan was coordinated and engineered to meet the exact dimensions and load requirements of this building structure. General Construction will be required to transport all building materials from storage to the project site, provide required protection of the materials once on site, and provide all labor, equipment, and supervision required to construct the building as per the manufacturer's Building Erection Manual. The contractor will not be permitted to transport the building components in the shipping containers they are currently being stored in. Question Deadline 04/26/2023 at 10:00 AM ET Questions are submitted online No
Award
Fire / Police
$500,000.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2023
June 5, 2023
35 Firemens Memorial Dr, Pomona, NY
Related To This Project
Pomona, NY
Bid Date: May 16 2023
Pomona, NY
Bid Date: May 23 2023
Pomona, NY
Bid Date: Jul 18 2023
Pomona, NY
Bid Date: Jun 27 2023
Pomona, NY
Bid Date: May 25 2023
Pomona, NY
Bid Date: Apr 11 2023
Pomona, NY
Bid Date: May 09 2023
Pomona, NY
Bid Date: Mar 31 2023
Pomona, NY
Bid Date: Apr 25 2023
Pomona, NY
Bid Date: Mar 23 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.