BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Skokie, Illinois. Completed plans call for site work for a 2,250-square-foot, one-story above grade water / sewer project.

The work consists of Conversion of Aeration Tank No. 1 to a Fermenter Tank, Construction of a RAS Pump Building, Installation of Fermented Sludge Pumps, Modification of Aeration Tanks No. 2 through 8, Installation of all other infrastructure required. (see attached scope of work). The estimated cost of the work under Contract 21-091-3P is between $16,638,205.00 and $20,140,985.00. Trades included but not limited to: Shoring, Sheeting, & Bracing, Demolition, Site Clearing, Earthwork, Drilled Concrete Piers & Shafts (Caissons), Site Utility Systems, Steam Distribution, Erosion & Sediment Control, Concrete Pavement, Site Concrete, Landscaping, Concrete Formwork, Accessories, & Reinforcement, Cast-In-Place Concrete, Concrete Curing, Grout, Masonry, Structural Steel, Steel Decking, Metal Fabrications, Pipe & Tube Railings, Stainless Steel Handrails, Railings & Guardrails, Rough Carpentry, Insulation, Roofing, Fireproofing, Firestopping, Joint Sealants, FRP Doors & Frames, Overhead Coiling Doors, Glazing, Painting, Signage, Fire Extinguishers, Stainless Steel Sliding Gate, Pumps & Appurtenances, Vertical Wet Pit Solids Handling Pumps & Appurtenances, Submersible Mixers, FRP Plank Baffle Wall System, Control System, Instruments, Hoisting Equipment, Portabel Cranes, HVAC, & Electrical. A. Scope includes work briefly described herein and other work shown or described in the contract documents to complete the project: 1. Conversion of Aeration Tank No. 1 to a Fermenter Tank, including the following: a. Eight (8) submersible propeller mixers equipped with VFDs in the tank. b. Portable davit cranes for removal of mixers. 2. Construction of a RAS Pump Building, including the following: a. 24-in diameter influent line connected to the Return Sludge Conduit. b. Three (3) Vertical Turbine Solids Handling Pumps, equipped with VFDs, each with a capacity of 2,780 gpm. c. 20-in diameter line with discharges to the Fermenter Tank. d. Monorail and trolley/hoist for removing the pumps. e. Pump and Electrical Rooms. 3. Installation of Fermented Sludge Pumps, including the following: a. Three (3) Submersible Solids Handling Pumps, equipped with VFDs, each with a capacity of 2,780 gpm. b. 12-in diameter lines for each pump which discharge to the Mixing Channel. c. Portable davit cranes for removal of pumps. 4. Modification of Aeration Tanks No. 2 through 8, including the following: a. Three (3) constant speed submersible propeller mixers in each tank (total of 21). b. Three (3) baffle walls in each tank (total of 21) to separate the treatment zones. c. Portable davit cranes for removal of mixers. 5. Installation of all other infrastructure required, including the following: a. Yard piping, site pavement, and all other Civil work required for the new facilities. b. Structural, Architectural, HVAC, and Plumbing work required for the new RAS Pump Station Building. c. Electrical and I&C work required to power and control all process and HVAC, including a ductbank carrying wiring and conduit to the new facilities from the existing Process Control Building and integration of the installed systems into the existing plant DCS system. MBE (20%), WBE (9%), DVBE (3%)

Bid Results

Water / Sewer

$14,850,000.00

Public - City

Site Work

108

29

47

10

Subscribe For Documents

85 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
101
Bidding Soon
1,953
All Active Projects
849
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 23, 2023

July 11, 2023

img_map_placeholder

3500 Howard St, Skokie, IL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.