BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, new construction, renovation and addition to an educational facility in Dallas, Texas. Completed plans call for site work for a educational facility; for the renovation of a educational facility; for the demolition of a educational facility; for the addition of a educational facility; and for the construction of a educational facility.

CSP Package bids are due to the owner the day after the GC bid date. This will be due on May 10th at 3pm. SCOPE OF WORK: Project consists of the following: 1. Scope item 1. Demolition: Demolition of existing site conditions for the improvements in conflict with the proposed renovation requirements as indicated in the drawings and specifications. 2. Scope item 2. Interior improvements: The existing school campus will undergo renovations to classrooms and lab area requirements as indicated in the drawings and specifications, with detailed scope as follows: a. New finishes (ceiling, flooring, paint) b. New lighting c. New controls (lighting, call buttons) d. New markerboards 3. Scope item 3. Addition: New Black Box building addition. This part of the Project consists of the following; Civil, Landscape, Structural, Architectural, Mechanical, Electrical, and Plumbing requirements as indicated in the drawings and specifications. BUDGET: ESTIMATED CONSTRUCTION BUDGET INCLUDING ALLOWANCES: Total Estimated Construction Budget (CCL + Allowances) for CSP CS 207166 $8,731,249.00 David Mogray will be the Owners Project Manager (PM) for the management of planning, design, permitting, construction, and post-construction for this CSP. All correspondence and communication during the contract finalization, construction and post-construction processes shall be directed to the Architect/Engineer firm (A/E) with copy to David Mogray. During construction, the PM shall have authority to act on behalf of Dallas ISD for Owner related direction. David Mogray, Project Manager Dallas Independent School District Construction Services Linus D. Wright Dallas ISD Administration Building 9400 N. Central Expressway Suite 800 Dallas, TX 75231 Phone: 972-925-7373 E-mail: C49180@dallasisd.org ARCHITECT/ENGINEER FIRM (A/E) Stantec Architecture, Inc. 6080 Tennyson Parkway Suite 200 Plano, TX 75024 Main Contact: Alejandro Hernandez, AIA Phone: 214 473-2742 Email: Al.Hernandez@stantec.com Main Contact: Maurice Thames, AIA Phone: 214-473-2433 Email: Maurice.Thames@stantec.com

Bid Results

Educational

$1,902,755.00

Public - County

Addition, Demolition, New Construction, Renovation, Site Work

194

37

29

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
148
Active Projects
65
Bidding Soon
3,549
All Active Projects
1,407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.